![matev SPR-HM-100 Скачать руководство пользователя страница 21](http://html1.mh-extra.com/html/matev/spr-hm-100/spr-hm-100_original-operating-manual_1740055021.webp)
Maintenance
Page 21
Attention!
Properly reattach all protective devices that have been dismounted after
executing the maintenance tasks.
Note!
•
After the first 20 hours of operation check all screw and bolt connections.
•
Subject the implement to regular maintenance.
•
Use lubricating grease to lubricate the moving parts.
7.2
Maintenance
The spreader must be cleaned and the container emptied after each use, as well as at
the start and end of the season. The following steps must be taken in this regard:
7.2.1
Maintenance schedule
•
Empty the implement and clean thoroughly to remove salt and spread material. To
do so, loosen and remove the screws in order to fold down the dosing rail.
Fig. 23: Folding down the dosing rail
•
Check the implement for damage and faults and replace any damaged parts.
•
Re-tighten all screws.
•
Lubricate the universal joint shaft with multi-purpose grease.
•
Lubricate all bolt connections, the valve gates and joints of the spread quantity
regulator and the agitators with grease
•
Check hoses and connecting cables for sound condition and replace if necessary
•
Repair rust damage immediately and oil the implement.
The gearbox is filled with oil at the factor and is maintenance free.