Installation
Page 11
1. Connect the counter-piece of the shaft with the implement and secure this with the screw
included in the scope of delivery.
2. Press the locking disk that is on the outer side and keep it depressed.
3. Slide the splined shaft onto the splined shaft of the PTO shaft.
4. Release the lock disk.
5. Slightly move the universal joint shaft back and forth until the locking disk audibly locks in
place.
Fig. 7: Allow the locking disk to lock in place
6. Hook the universal joint shaft safety chains to a stationary part on the tractor and on the
implement.
4.4
Drive kit, hydraulic
If the spreader is driven hydraulically the speed (15 rpm) of the roller can be adjusted by
means of the valve.
Fig. 8: Drive kit, hydraulic