![matev SPR-HM-100 Скачать руководство пользователя страница 14](http://html1.mh-extra.com/html/matev/spr-hm-100/spr-hm-100_original-operating-manual_1740055014.webp)
Installation
Page 14
The cable for the lights is routed in the channel and fastened with cable ties.
Fig. 14: Routing of cables
An optional hoop guard can be mounted over the lights.
4.9
Work light
The work light with mud guard can be connected only in combination with the lighting
system. The cable for the work light is connected to the lighting system.
Fig. 15: Work light