Generation II Entree Bath
– All Models
OPERATION MANUAL
07-01-2018
Page 33 of 50
2071 14
th
Ave – Columbus, NE 68601
800-798-5867 FAX: 402-563-9102
www.mastercarebath.com
ENTREE BATH TRAINING CHECK LIST
After reviewing the operation and safety instructions in this manual, the Entree Bath can be operated and all components
can be identified.
OPERATION:
YES
NO
Turn On BathAire
(SM)
Control
Move Individual Into The Entree Bath
Secure Individual
Close Tub Door With Push Buttons
Close Drain With Open/Close Lever
Adjust Mixing Valve To Desired Temperature
Fill Tub with Tub Fill Valve
Use Liquids As Desired
Use Shower Wand With Shower Wand Control Valve
Open Drain With Open/Close Lever
After Water Is Drained, Open Tub Door With Push Buttons
Move Individual Out Of The Entree Bath
Return Individual To Room Or Desired Location
Remove Comfort Pads And Place In Foot Well
Use Disinfectant To Clean Tub And Pads
Rinse Disinfectant From The Tub And Pads
LOCATE & IDENTIFY:
LCD Thermometer
GFCI reset
Aromatherapy Access Cap & Canister
Wall Chart
T-Handle Allen Wrench
Casual Water Drain
Training Date:
Staff:
Supervisor:
Please, make copies of this training checklist for each staff member that will operate the Entree Bath.