19
STEP 4
INSTALL CEILING PANELS
-Place a protective padding material between the lift and the
ceiling panel.
-Carefully lift the ceiling panels into place.
-Refrigerant line location.
1.
Some Blast Chillers have refrigeration tubing
extending out of the top of the chiller box.
2.
Care must be taken to prevent damage to refrigerant
lines when lowering ceiling panels onto box.
3.
Refrigerant line size and location will depend on the
blast chiller and condensing unit purchased; see the
Condensing Unit and Refrigeration Unit Installation
section in this manual to determine the correct
location and hole sizes.
4.
Drill holes required.
DANGER
DO NOT LIFT PANEL AT THE OUTER EDGES.
NOTICE
Master-bilt
recommends safety be your first priority at all times. Use either a forklift or
a properly designed panel-lifting device to lift the ceiling panels.
WARNING
Beware of others on the opposite side of the panel when drilling through the wall.
CAUTION
Do not drill holes through the evaporator or fan assemblies.
Содержание Master-Chill MCR-33-101PT
Страница 2: ...2 ...
Страница 57: ...57 EVFTFT818 REMOVABLE PROBE ASSEMBLIES EVFTFT818 ...