23
STEP 8
In this step you route the electrical control wiring
CONTROL WIRING
-Control panel is pre-wired.
-Check all conduit and wire connections to insure they remained secure during shipping.
-Mount the optional door switch(s) if provided.
1.
Switch is mounted outside the box
-Install the door, light, and heater conduit.
1.
Drill hole through the ceiling above the electrical box
located inside the chiller by the light fixture for the
flexible conduit to feed through.
2.
Feed the flexible conduit labeled "Door Light and
Heater" through the hole in the ceiling panel.
3.
Connect wires.
-Connect the fan bank power.
1.
Remove the fan assembly grill.
2.
Drill hole through the ceiling above the fan tower
assembly.
3.
Feed the flexible conduit labeled "Fan" through the
ceiling (as indicated in the graphic on the opposite
page) to the Blast Chiller Fan Assembly.
4.
Connect the wires.
5.
Assure the conduit watertight connection on the top
of the fan bank is secure.
6.
Apply wire nut connectors (included).
7.
Check fans and insure all blades turn freely.
8.
Replace the fan assembly grill.
NOTICE
The Blast Chiller wiring has been completely pre-assembled by the manufacturer.
NOTICE
The control wiring, with watertight conduit, is pre-cut and ready to connect.
WARNING
Beware of others on the opposite side of the panel when drilling through the walls and ceiling.
CAUTION
Do not drill holes through the evaporator or fan assemblies.
NOTICE
A qualified and certified electrician should only perform this work.