14
SITE CHECKLIST
-Inspect the area where your
Master-Bilt
®
Blast Chiller will be installed.
1.
Check to make sure the floor is level.
a.
The entire floor under the Blast Chiller must be level, clean, and smooth.
2.
Check the ceiling height above the Blast Chiller area:
a.
Refer to the enclosed print specific to this project.
b.
The top area of the Blast Chiller must be accessible for servicing.
c.
Make sure proper clearance is allowed.
3.
Ensure a drain is located near the Blast Chiller.
a.
Make sure the drain is located relative to the enclosed Blast Chiller print.
b.
Measure and locate where the drain will exit the Blast Chiller box.
4.
Ensure electrical supply is near the Blast Chiller.
a.
Review the enclosed Blast Chiller print to determine the best location for
the (customer supplied) electrical disconnects for the two electrical
supplies required.
i.
On an adjacent wall for blast chiller.
ii.
At condensing unit.
b.
Measure and locate where the electrical supply will be located.
c.
Review the enclosed Blast Chiller prints for voltage, amperage, phase and
location.
5.
Ensure adequate clearance is allowed for the door to the Blast Chiller to swing
open.
NOTICE
The existing surface must be level before the blast chiller is installed. If it is not, leveling must
be performed to insure proper installation. If the floor area under the Blast Chiller is not level
and smooth, have the area grouted.
Содержание Master-Chill MCR-33-101PT
Страница 2: ...2 ...
Страница 57: ...57 EVFTFT818 REMOVABLE PROBE ASSEMBLIES EVFTFT818 ...