9
INSTALLATION
PRE-INSTALLATION
Read and comply with the following information:
-Packing List ·····································
-Van Shipment (if applicable) ·················
-Freight Claims ··································
-Site Checklist ····································
INSTALLATION
Special equipment needed for installation includes:
-Fork lift or hoist
Your envelope contains:
-Your
Master-Bilt
®
Blast Chiller Installation and Operations Manual
-Customized drawings and diagrams for your specific order:
Installation diagram
Panel numbering diagram
Wiring diagram*
*2 identical wiring diagrams are provided:
One is included in the envelope for use at the installation site.
One is a permanent part of your manual.
AFTER INSTALLATION
Complete the Installation Data on pages 44 to 46.
Retain one copy.
Return one copy to
Master-Bilt
.
Leave one copy at the installation site.
NOTICE
Master-Bilt
recommends you practice safe
lifting and safe moving techniques.
Содержание Master-Chill MCR-33-101PT
Страница 2: ...2 ...
Страница 57: ...57 EVFTFT818 REMOVABLE PROBE ASSEMBLIES EVFTFT818 ...