27
CONTROL OPERATION AND PROGRAMMING
The blast chiller is operated by an electronic control which can manage both Temperature-Controlled, and
Time by hard or soft blast chilling and freezing cycle. The controller has three main modes HOLD, CHILL
CYCLE, and FREEZE CYCLE. Every operating cycle can be preceded by pre-cooling the blast chiller
the box. In addition, there is a favorite list (Star keys), which may be programmed for a specific operating
mode depending on the options selected by the operator.
The following operating statuses exist:
- The “off” status (the device is not powered)
- The “stand-by” status (the device is powered and is off)
- The “on” status (the device is powered, is on and is in stand-by for the start-up of an operating cycle)
- The “run” status (the device is powered, is on and an operating cycle is in progress).
Hereon, the term "device switch-on" means the passage from the "stand-by" status to the "on" status. The term
"switch-off" means passage from the "on" status to the "stand-by" status.
If a power cut OFF occurs during the "stand-by" status or during the "on" status, the device will re-propose the
same status when the power supply is restored.
If a power cut OFF occurs during the "run" status, the device will operate as follows when this is restored:
- If a temperature-controlled blast chilling or deep freezing operation was in progress, these will be started
again from the beginning
- If a timed-controlled blast chilling or deep freezing operation was in progress, these will be started again from
the moment the power supply was cut-off
- If storage was in progress, this will be re-proposed.
Содержание Master-Chill MCR-33-101PT
Страница 2: ...2 ...
Страница 57: ...57 EVFTFT818 REMOVABLE PROBE ASSEMBLIES EVFTFT818 ...