SPARTAN IRONWORKER
INSTALLATION
© MARVEL MFG. CO., INC. MANUAL
PL/OMIW-2CYL-V2
(08//07)
A-4
•
Normal / Jog switch - Normal
•
Shear /Notch switch - Notch
2.
Turn the Main Electrical Disconnect
switch on.
3.
Open the notching station's guard and
make sure all other guards and covers are
in place.
The hydraulic pump can be
damaged if the main power
leads
are
not
connected
properly. Do not operate the
pump more than 3 seconds
during this check.
4.
While stepping firmly on the notching
station's foot switch, press the "Pump On"
pushbutton, briefly observe the notching
station for movement, and then press the
"Pump Off" pushbutton.
5.
If the notching station moved, continue
with step 6.
If the notching station did not move, the wires to
the main electrical disconnect switch are
improperly connected. To change the connections:
a.
Turn off the Main Electrical Disconnect
switch.
Hazardous voltage.
Will cause serious injury or
death.
Turn
off
supply
electricity at your facility’s
circuit breaker before making
electrical connections to the
machine.
b.
Turn off the machine's supply voltage at
your facility's circuit breaker.
c.
Open the machine's electrical panel door.
d.
Reverse power leads L1 and L2, or L2 and
L3, not both.
e.
Repeat steps 1 through 5 above.
Reverse L1 and L2 or L2 and L3 if the punching does not
move during the electrical check.
6.
Turn the Main Electrical Disconnect
switch off.
FINAL INSPECTION
After the machine has been installed, a final,
thorough inspection should be performed. The
following checklist will help locate any items that
may need further attention:
•
Loose components, guards or panels
•
Loose fasteners and fittings
•
Loose hoses and conduit
•
Missing or damaged items
•
Hydraulic leaks
•
Tools and other material left on the machine
•
Overall condition and readiness for use
CAUTION
DANGER
L2
L1
L3