5.6.4 First-Aid Measures
Eyes: Immediately flush eyes with plenty of cool water
for at least 15 minutes. Hold eyelids apart while flushing
to rinse entire surface of eye and lids with water. Seek
immediate medical attention.
Skin: In case of cold burns, immediately place affected
area in warm water (104-107 F, 40-42 C) and keep
immersed until circulation returns. Seek immediate medi-
cal attention.
Other requirements: Severe inhalation or overexposure
to this material may sensitize the heart to cat echo la
mine-induced arrhythmia. Do not administer cat echo la
mine* to overexposed individuals. Contact the Poisons
Information Service and/or seek further medical advice.
*(Cat echo la mine are chemical compounds derived
from the amino and tyrosine that act as hormones or
neurotransmitters. “Wikipedia Encyclopedia”)
5.6.5 Fire-Fighting Measures
Activate emergency systems and/or sound the alarm.
Call the Fire Department. Evacuate all persons from
the area.
Ensure an escape route is always available from any
fire. If it is safe to do so, close the container valves.
If unable to cut off supply of gas, allow it to burn.
Allow any gas-fueled fire to burn out.
Keep LPG cylinders or tanks cool, as pressurized
containers will explode if subjected to high tempera-
tures.
Small LPG fires can be attacked with dry powder fire
extinguishers, provided the fuel supply can be turned
off after the fire is extinguished.
5.6.6 Accidental Release Measures
As these substances have a very low flash point, any
spillage or leak is a severe fire and/or explosion hazard.
Take the following measures in the event of a leak:
If a leak has not ignited, stop gas flow at container,
eliminate all sources of ignition, and evacuate all
persons. Stay upwind of release. Inform emergency
services.
1.
2.
3.
4.
1.
Liquid leaks generate large volumes of flammable
vapor, heavier than air, which may travel to sources
of ignition (e.g. along drainage systems).
Where appropriate, use water spray to disperse the
gas or vapor.
Vapor may collect in any confined space.
If spillage has occurred in a confined space, ensure
adequate ventilation and check that a safe, breath-
able atmosphere is present before entry.
Do not enter a vapor cloud. Only trained specialized
individuals should attempt to enter a vapor cloud.
Wear protective clothing (see section on Exposure
Controls / Personal Protection).
Small quantities of spilled liquid may be allowed to evapo-
rate. Vapor should be dispersed by effective ventilation.
In the event of a major leak, contact the appropriate
authorities.
5.6.7 Handling and Storage
Store and use only in equipment/containers for use
with your particular appliance. Tanks should only
be stored in a locker installed and designed for LPG
storage, outside the living areas of the boat.
Installation of added appliances should only be per-
formed by qualified personnel.
Follow manufacturer’s instructions for changing
tanks.
Ensure good ventilation.
Avoid inhalation of vapor.
When handling cylinders, wear protective footwear
and suitable gloves.
When handling cylinders (above head height) protec-
tive headgear may be necessary.
When changing tanks, wear suitable gloves and
safety goggles or face shields.
Avoid contact with the eyes.
2.
3.
4.
5.
6.
7.
1.
2.
3.
4.
5.
6.
7.
8.
9.
Fuel Systems
5.6
Содержание MH31
Страница 1: ...31 31 H V1 R01_121514 Operator s Manual U N T E R M A R L O W MH31 MARLOW HUNTER LLC...
Страница 2: ......
Страница 11: ...Introduction Chapter 1 MH31 MARLOW HUNTER LLC V1 R01_121514...
Страница 12: ...Introduction i This Page Intentionally Left Blank...
Страница 17: ...Introduction 1 5 Notes...
Страница 18: ...Introduction 1 6 Notes...
Страница 19: ...Documents Forms Chapter 2 MH31 MARLOW HUNTER LLC and V1 R01_121514...
Страница 20: ...Documents and Forms This Page Intentionally Left Blank i...
Страница 31: ...Documents and Forms 2 11 Float Plan 1 1 Figure 2 4...
Страница 44: ...Documents and Forms 2 24 Power Squadron recommendations for maintenance and safe boating...
Страница 45: ...Documents and Forms Local sailing club or marina s recommendations for maintenance and up keep 2 25...
Страница 46: ...Documents and Forms 2 26 Dates of practice drills and onboard safety inspections...
Страница 47: ...Documents and Forms My personal preferences for maintenance items safety gear 2 27...
Страница 48: ...Documents and Forms 2 28 Notes...
Страница 49: ...Limited Warranty Chapter 3 MH31 MARLOW HUNTER LLC V1 R01_121514...
Страница 50: ...This Page Intentionally Left Blank Limited Warranty 3 2...
Страница 64: ...Limited Warranty 3 16 Notes...
Страница 65: ...Boating Safety Chapter 4 MH31 MARLOW HUNTER LLC V1 R01_121514...
Страница 66: ...Boating Safety i This Page Intentionally Left Blank...
Страница 86: ...Boating Safety 4 20 MH31 DECK HARDWARE LAYOUT Figure 4 9...
Страница 89: ...Boating Safety 4 23 Notes...
Страница 90: ...Boating Safety 4 24 Notes...
Страница 91: ...Fuel Systems Chapter 5 MH31 MARLOW HUNTER LLC V1 R01_121514...
Страница 92: ...This Page Intentionally Left Blank Fuel Systems i...
Страница 102: ...Figure 5 11 FUEL SYSTEM LAYOUT WITH OPTIONAL GENERATOR Fuel Systems 5 10...
Страница 103: ...LPG SYSTEM LAYOUT Figure 5 12 Fuel Systems 5 11...
Страница 104: ...Notes Fuel Systems 5 12...
Страница 105: ...MH31 Underwater Gear Chapter 6 V1 R01_121514 MARLOW HUNTER LLC...
Страница 106: ...Underwater Gear i This Page Intentionally Left Blank...
Страница 113: ...Underwater Gear 6 7 Figure 6 15 Figure 6 16...
Страница 115: ...Underwater Gear 6 9 INTAKES DISCHARGES BELOW WATERLINE Figure 6 17...
Страница 117: ...Underwater Gear 6 11 Notes...
Страница 118: ...Underwater Gear 6 12 Notes...
Страница 119: ...DC Electric System Chapter 7 MH31 MARLOW HUNTER LLC V1 R01_121514...
Страница 120: ...DC Electric Systems i This Page Intentionally Left Blank...
Страница 137: ...DC Electric Systems 7 17 DC OUTLET LAYOUT Figure 7 21...
Страница 138: ...DC Electric Systems 7 18 Notes...
Страница 139: ...MARLOW HUNTER LLC MH31 AC Electric System Chapter 8 V1 R01_121514...
Страница 140: ...AC Electric Systems i This Page Intentionally Left Blank...
Страница 153: ...AC Electric Systems 8 13 AC SYSTEM MAJOR COMPONENT GENERAL LAYOUT WITH INVERTER Figure 8 18...
Страница 155: ...AC Electric Systems 8 15 AIR CONDITIONER DUCTING LAYOUT Figure 8 20...
Страница 156: ...AC Electric Systems 8 16 Notes...
Страница 157: ...MARLOW HUNTER LLC MH31 Water Systems Chapter 9 V1 R01_121514...
Страница 158: ...Water Systems i This Page Intentionally Left Blank...
Страница 166: ...Water Systems 9 8 FRESH WATER LAYOUT Figure 9 14...
Страница 168: ...Water Systems 9 10 STANDARD TOILET AND OPTIONAL AIR CONDITIONING RAW WATER LAYOUT Figure 9 15...
Страница 169: ...Water Systems 9 11 Notes...
Страница 170: ...Water Systems 9 12 Notes...
Страница 171: ...Waste Systems Chapter 10 MH31 MARLOW HUNTER LLC V1 R01_121514...
Страница 172: ...Waste and Sanitation Systems i This Page Intentionally Left Blank...
Страница 181: ...Waste and Sanitation Systems 10 9 BILGE SUMP PUMP DRAIN SYSTEM LAYOUT Figure 10 17...
Страница 183: ...Waste and Sanitation Systems 10 11 BLACK WATER ENGINE COMPARTMENT BLOWER LAYOUT Figure 10 20...
Страница 184: ...Waste and Sanitation Systems 10 12 Notes...
Страница 185: ...MH31 Engines Transmissions Chapter 11 MARLOW HUNTER LLC and V1 R01_121514...
Страница 186: ...Engines and Transmissions i This Page Intentionally Left Blank...
Страница 188: ...Engines and Transmissions 11 2 Engines and Transmissions 11 2 Figure 11 2...
Страница 189: ...Engines and Transmissions 11 3 Figure 11 4...
Страница 197: ...Engines and Transmissions 11 11 Notes...
Страница 198: ...Engines and Transmissions 11 12 Notes...
Страница 199: ...and V1 R01_121514 MARLOW HUNTER LLC MH31 Sails Rigging Chapter 12...
Страница 200: ...Sails and Rigging i This Page Intentionally Left Blank...
Страница 214: ...Sails and Rigging 12 14 Figure 12 14 GENERAL RIG COMPONENTS...
Страница 215: ...Sails and Rigging 12 15 MAINSAIL JIB SPECIFICATIONS Figure 12 15...
Страница 220: ...Sails and Rigging 12 20 Figure 12 21 MAINSHEET BOOM OUTHAUL LAYOUT...
Страница 222: ...Sails and Rigging 12 22 VANG LAYOUT CONVENTIONAL SOLID Figure 12 23...
Страница 224: ...Sails and Rigging 12 24 Figure 12 25 SPINNAKER LAYOUT OPTION...
Страница 225: ...Sails and Rigging 12 25 Figure 12 26 GENERALIZED REEFING LAYOUT...
Страница 226: ...Sails and Rigging 12 26 LAZY JACK LAYOUT WITH OPTIONAL STACK PACK SAIL COVER Figure 12 27...
Страница 227: ...Sails and Rigging 12 27 STACK PACK SAIL COVER INSTALLATION WITH LAZY JACKS Figure 12 28...
Страница 228: ...Sails and Rigging 12 28 Notes...
Страница 229: ...MH31 Getting Underway Chapter 13 MARLOW HUNTER LLC V1 R01_121514...
Страница 230: ...Getting Underway i This Page Intentionally Left Blank...
Страница 236: ...Getting Underway 13 6 Notes...
Страница 237: ...MH31 Maintenance Chapter 14 MARLOW HUNTER LLC V1 R01_121514...
Страница 238: ...Maintenance i This Page Intentionally Left Blank...
Страница 253: ...Maintenance 14 15 SLING LOCATIONS Figure 14 3...
Страница 254: ...Maintenance 14 16 Notes...
Страница 255: ...Glossary Chapter 15 MH31 MARLOW HUNTER LLC V1 R01_121514...
Страница 256: ...Glossary i This Page Intentionally Left Blank...