Using the wrong type of fuel will result in severe
damage to the engines. Refer to your engine OEM
manual for fuel recommendations.
DANGER
!
!
Leaking fuel is a fire and explosion hazard. Personal
injury or death could occur.
Figure. 5.3
5.1.5 Fuel Tank Vent
The fuel tank incorporates a thru-deck vent fitting and is
located inboard of the starboard transom garage door
(see left side Fig. 5.4). The fuel tank vent serves as a
pressure / vacuum release and safety overflow. The vent
incorporates a flame arrestor, thus it is imperative that you
keep the screens clear and in excellent repair. Replace
the screens immediately if they become damaged or dis-
placed. Periodically check the vent for clogging.
Figure. 5.4
The deck fill and vent hose, fittings, and connections
should be inspected for leaks, signs of dry rot or swell-
ing at least once a year. If any of these conditions are
present, have an authorized service technician inspect
the fuel system immediately. If a leak is found, turn off
battery switches, disconnect shore power, and disable
any possible source of ignition. Contact your dealer or
Customer Service immediately.
5.2 Fuel Supply Lines and Hoses
If any fuel fill or vent hose's are in need of replacement,
ensure that only USCG Type A1 or A2 are used.
The engine has a fuel supply hose that runs from the
pickup tube in the fuel tank to the water separator (com-
monly referred to as the fuel filter), then from the water
separator to the engine. Also, the engine has a fuel
return hose that runs from the engine back to the fuel
tank. If your boat has the optional generator, the genera-
tor will have the same basic setup with supply and return
hoses (Fig. 5.11).
The fuel supply lines or hoses, fitting, and connections
should be inspected often for leaks, signs of wear, dry rot,
chafing, or swelling. A good way to inspect the fuel hoses
is to run your hand along the length of the hose and fit-
tings. Leaks will be revealed as wet spots on your hand.
If any evidence of hose deterioration is present, have
a qualified technician replace all the hoses with USCG
Type A1 or A2 hoses immediately!
DANGER
!
!
The use of any hose other than the USCG Type A1
or A2 could result in fuel leakage. Leaking fuel is a
fire and explosion hazard. Personal injury or death
could result.
NOTE: If a leak is found, turn off battery switches, discon-
nect shore power, and disable any source of ignition. Do not
start your engines, the generator, or any devices that could
create a spark. Contact your dealer or our Customer Service
Department immediately! If hoses need to be replaced, make
sure only USCG Type A1 or A2 are used.
5.3 Fuel Valves
Your boat has fuel shutoff valves located at the tank in
the supply line route (see engine fuel line lower right Fig.
5.4). These valves start or stop the flow of fuel through
the supply lines.
NOTE: Even if the fuel supply valves are closed, there may
be fuel in the supply lines to the filter and engine (and optional
Fuel Systems
5.2
Содержание MH31
Страница 1: ...31 31 H V1 R01_121514 Operator s Manual U N T E R M A R L O W MH31 MARLOW HUNTER LLC...
Страница 2: ......
Страница 11: ...Introduction Chapter 1 MH31 MARLOW HUNTER LLC V1 R01_121514...
Страница 12: ...Introduction i This Page Intentionally Left Blank...
Страница 17: ...Introduction 1 5 Notes...
Страница 18: ...Introduction 1 6 Notes...
Страница 19: ...Documents Forms Chapter 2 MH31 MARLOW HUNTER LLC and V1 R01_121514...
Страница 20: ...Documents and Forms This Page Intentionally Left Blank i...
Страница 31: ...Documents and Forms 2 11 Float Plan 1 1 Figure 2 4...
Страница 44: ...Documents and Forms 2 24 Power Squadron recommendations for maintenance and safe boating...
Страница 45: ...Documents and Forms Local sailing club or marina s recommendations for maintenance and up keep 2 25...
Страница 46: ...Documents and Forms 2 26 Dates of practice drills and onboard safety inspections...
Страница 47: ...Documents and Forms My personal preferences for maintenance items safety gear 2 27...
Страница 48: ...Documents and Forms 2 28 Notes...
Страница 49: ...Limited Warranty Chapter 3 MH31 MARLOW HUNTER LLC V1 R01_121514...
Страница 50: ...This Page Intentionally Left Blank Limited Warranty 3 2...
Страница 64: ...Limited Warranty 3 16 Notes...
Страница 65: ...Boating Safety Chapter 4 MH31 MARLOW HUNTER LLC V1 R01_121514...
Страница 66: ...Boating Safety i This Page Intentionally Left Blank...
Страница 86: ...Boating Safety 4 20 MH31 DECK HARDWARE LAYOUT Figure 4 9...
Страница 89: ...Boating Safety 4 23 Notes...
Страница 90: ...Boating Safety 4 24 Notes...
Страница 91: ...Fuel Systems Chapter 5 MH31 MARLOW HUNTER LLC V1 R01_121514...
Страница 92: ...This Page Intentionally Left Blank Fuel Systems i...
Страница 102: ...Figure 5 11 FUEL SYSTEM LAYOUT WITH OPTIONAL GENERATOR Fuel Systems 5 10...
Страница 103: ...LPG SYSTEM LAYOUT Figure 5 12 Fuel Systems 5 11...
Страница 104: ...Notes Fuel Systems 5 12...
Страница 105: ...MH31 Underwater Gear Chapter 6 V1 R01_121514 MARLOW HUNTER LLC...
Страница 106: ...Underwater Gear i This Page Intentionally Left Blank...
Страница 113: ...Underwater Gear 6 7 Figure 6 15 Figure 6 16...
Страница 115: ...Underwater Gear 6 9 INTAKES DISCHARGES BELOW WATERLINE Figure 6 17...
Страница 117: ...Underwater Gear 6 11 Notes...
Страница 118: ...Underwater Gear 6 12 Notes...
Страница 119: ...DC Electric System Chapter 7 MH31 MARLOW HUNTER LLC V1 R01_121514...
Страница 120: ...DC Electric Systems i This Page Intentionally Left Blank...
Страница 137: ...DC Electric Systems 7 17 DC OUTLET LAYOUT Figure 7 21...
Страница 138: ...DC Electric Systems 7 18 Notes...
Страница 139: ...MARLOW HUNTER LLC MH31 AC Electric System Chapter 8 V1 R01_121514...
Страница 140: ...AC Electric Systems i This Page Intentionally Left Blank...
Страница 153: ...AC Electric Systems 8 13 AC SYSTEM MAJOR COMPONENT GENERAL LAYOUT WITH INVERTER Figure 8 18...
Страница 155: ...AC Electric Systems 8 15 AIR CONDITIONER DUCTING LAYOUT Figure 8 20...
Страница 156: ...AC Electric Systems 8 16 Notes...
Страница 157: ...MARLOW HUNTER LLC MH31 Water Systems Chapter 9 V1 R01_121514...
Страница 158: ...Water Systems i This Page Intentionally Left Blank...
Страница 166: ...Water Systems 9 8 FRESH WATER LAYOUT Figure 9 14...
Страница 168: ...Water Systems 9 10 STANDARD TOILET AND OPTIONAL AIR CONDITIONING RAW WATER LAYOUT Figure 9 15...
Страница 169: ...Water Systems 9 11 Notes...
Страница 170: ...Water Systems 9 12 Notes...
Страница 171: ...Waste Systems Chapter 10 MH31 MARLOW HUNTER LLC V1 R01_121514...
Страница 172: ...Waste and Sanitation Systems i This Page Intentionally Left Blank...
Страница 181: ...Waste and Sanitation Systems 10 9 BILGE SUMP PUMP DRAIN SYSTEM LAYOUT Figure 10 17...
Страница 183: ...Waste and Sanitation Systems 10 11 BLACK WATER ENGINE COMPARTMENT BLOWER LAYOUT Figure 10 20...
Страница 184: ...Waste and Sanitation Systems 10 12 Notes...
Страница 185: ...MH31 Engines Transmissions Chapter 11 MARLOW HUNTER LLC and V1 R01_121514...
Страница 186: ...Engines and Transmissions i This Page Intentionally Left Blank...
Страница 188: ...Engines and Transmissions 11 2 Engines and Transmissions 11 2 Figure 11 2...
Страница 189: ...Engines and Transmissions 11 3 Figure 11 4...
Страница 197: ...Engines and Transmissions 11 11 Notes...
Страница 198: ...Engines and Transmissions 11 12 Notes...
Страница 199: ...and V1 R01_121514 MARLOW HUNTER LLC MH31 Sails Rigging Chapter 12...
Страница 200: ...Sails and Rigging i This Page Intentionally Left Blank...
Страница 214: ...Sails and Rigging 12 14 Figure 12 14 GENERAL RIG COMPONENTS...
Страница 215: ...Sails and Rigging 12 15 MAINSAIL JIB SPECIFICATIONS Figure 12 15...
Страница 220: ...Sails and Rigging 12 20 Figure 12 21 MAINSHEET BOOM OUTHAUL LAYOUT...
Страница 222: ...Sails and Rigging 12 22 VANG LAYOUT CONVENTIONAL SOLID Figure 12 23...
Страница 224: ...Sails and Rigging 12 24 Figure 12 25 SPINNAKER LAYOUT OPTION...
Страница 225: ...Sails and Rigging 12 25 Figure 12 26 GENERALIZED REEFING LAYOUT...
Страница 226: ...Sails and Rigging 12 26 LAZY JACK LAYOUT WITH OPTIONAL STACK PACK SAIL COVER Figure 12 27...
Страница 227: ...Sails and Rigging 12 27 STACK PACK SAIL COVER INSTALLATION WITH LAZY JACKS Figure 12 28...
Страница 228: ...Sails and Rigging 12 28 Notes...
Страница 229: ...MH31 Getting Underway Chapter 13 MARLOW HUNTER LLC V1 R01_121514...
Страница 230: ...Getting Underway i This Page Intentionally Left Blank...
Страница 236: ...Getting Underway 13 6 Notes...
Страница 237: ...MH31 Maintenance Chapter 14 MARLOW HUNTER LLC V1 R01_121514...
Страница 238: ...Maintenance i This Page Intentionally Left Blank...
Страница 253: ...Maintenance 14 15 SLING LOCATIONS Figure 14 3...
Страница 254: ...Maintenance 14 16 Notes...
Страница 255: ...Glossary Chapter 15 MH31 MARLOW HUNTER LLC V1 R01_121514...
Страница 256: ...Glossary i This Page Intentionally Left Blank...