Waste and Sanitation Systems
10.3
Figure 10.3
10.2.3 High Water Bilge Pump
The optional high water bilge pump is a redundant sys-
tem for additional protection on water accumulation within
the boat. As noted above, if a high water condition exists
and the optional high water bilge pump is installed (Fig.
10.2), the pump will be activated in conjunction with the
alarm.
It is located in the main bilge and accessed through the
forward center floor panel in the main cabin. It has a
pumping capacity of 66 GPM and functions to remove
water from the bilges in the event the main bilge pump
is overwhelmed or becomes inoperable. The pump will
discharge waste through a starboard thru-hull.
10.2.3 Manual Bilge Pump
The manual bilge pump (Fig. 10.4), located in the port
forward cockpit, is also a redundant system for addi-
tional protection. The pump includes a manual handle
to be inserted into the pump mechanism where the up
and down motion on the handle will begin discharging
water out the thru-hull mounted on the port sidewall of
the steering cavity. Pumping capacity will depend on
the speed of the pump action. The actual pump can be
access through the port seat lid. The manual handle is
stored on the underside of the port seat lid. The receiver
for the manual handle is mounted to the port cockpit seat
face (includes a flip-down cover) (Fig. 10.5). The hose
intake is located in the main bilge (Fig. 10.2)
Figure 10.4
Figure 10.5
10.2.4 Grey Water Collection Box/Pump System
The collection box/pump system (Fig. 10.6) serves to
automatically discharge grey water originating from the
vanity sink, shower and condensation from the optional
air conditioning system which all drain into the collec-
tion box. The unit is located in the main cabin and is
accessed through the center aft floor panel.
No maintenance is required on the pump itself. However,
the system includes a filter to collect larger waste materi-
als. Periodically service the filter by removing the lid for
access. Remove the filter and clean. Replace the filter
and lid when done.
Содержание MH31
Страница 1: ...31 31 H V1 R01_121514 Operator s Manual U N T E R M A R L O W MH31 MARLOW HUNTER LLC...
Страница 2: ......
Страница 11: ...Introduction Chapter 1 MH31 MARLOW HUNTER LLC V1 R01_121514...
Страница 12: ...Introduction i This Page Intentionally Left Blank...
Страница 17: ...Introduction 1 5 Notes...
Страница 18: ...Introduction 1 6 Notes...
Страница 19: ...Documents Forms Chapter 2 MH31 MARLOW HUNTER LLC and V1 R01_121514...
Страница 20: ...Documents and Forms This Page Intentionally Left Blank i...
Страница 31: ...Documents and Forms 2 11 Float Plan 1 1 Figure 2 4...
Страница 44: ...Documents and Forms 2 24 Power Squadron recommendations for maintenance and safe boating...
Страница 45: ...Documents and Forms Local sailing club or marina s recommendations for maintenance and up keep 2 25...
Страница 46: ...Documents and Forms 2 26 Dates of practice drills and onboard safety inspections...
Страница 47: ...Documents and Forms My personal preferences for maintenance items safety gear 2 27...
Страница 48: ...Documents and Forms 2 28 Notes...
Страница 49: ...Limited Warranty Chapter 3 MH31 MARLOW HUNTER LLC V1 R01_121514...
Страница 50: ...This Page Intentionally Left Blank Limited Warranty 3 2...
Страница 64: ...Limited Warranty 3 16 Notes...
Страница 65: ...Boating Safety Chapter 4 MH31 MARLOW HUNTER LLC V1 R01_121514...
Страница 66: ...Boating Safety i This Page Intentionally Left Blank...
Страница 86: ...Boating Safety 4 20 MH31 DECK HARDWARE LAYOUT Figure 4 9...
Страница 89: ...Boating Safety 4 23 Notes...
Страница 90: ...Boating Safety 4 24 Notes...
Страница 91: ...Fuel Systems Chapter 5 MH31 MARLOW HUNTER LLC V1 R01_121514...
Страница 92: ...This Page Intentionally Left Blank Fuel Systems i...
Страница 102: ...Figure 5 11 FUEL SYSTEM LAYOUT WITH OPTIONAL GENERATOR Fuel Systems 5 10...
Страница 103: ...LPG SYSTEM LAYOUT Figure 5 12 Fuel Systems 5 11...
Страница 104: ...Notes Fuel Systems 5 12...
Страница 105: ...MH31 Underwater Gear Chapter 6 V1 R01_121514 MARLOW HUNTER LLC...
Страница 106: ...Underwater Gear i This Page Intentionally Left Blank...
Страница 113: ...Underwater Gear 6 7 Figure 6 15 Figure 6 16...
Страница 115: ...Underwater Gear 6 9 INTAKES DISCHARGES BELOW WATERLINE Figure 6 17...
Страница 117: ...Underwater Gear 6 11 Notes...
Страница 118: ...Underwater Gear 6 12 Notes...
Страница 119: ...DC Electric System Chapter 7 MH31 MARLOW HUNTER LLC V1 R01_121514...
Страница 120: ...DC Electric Systems i This Page Intentionally Left Blank...
Страница 137: ...DC Electric Systems 7 17 DC OUTLET LAYOUT Figure 7 21...
Страница 138: ...DC Electric Systems 7 18 Notes...
Страница 139: ...MARLOW HUNTER LLC MH31 AC Electric System Chapter 8 V1 R01_121514...
Страница 140: ...AC Electric Systems i This Page Intentionally Left Blank...
Страница 153: ...AC Electric Systems 8 13 AC SYSTEM MAJOR COMPONENT GENERAL LAYOUT WITH INVERTER Figure 8 18...
Страница 155: ...AC Electric Systems 8 15 AIR CONDITIONER DUCTING LAYOUT Figure 8 20...
Страница 156: ...AC Electric Systems 8 16 Notes...
Страница 157: ...MARLOW HUNTER LLC MH31 Water Systems Chapter 9 V1 R01_121514...
Страница 158: ...Water Systems i This Page Intentionally Left Blank...
Страница 166: ...Water Systems 9 8 FRESH WATER LAYOUT Figure 9 14...
Страница 168: ...Water Systems 9 10 STANDARD TOILET AND OPTIONAL AIR CONDITIONING RAW WATER LAYOUT Figure 9 15...
Страница 169: ...Water Systems 9 11 Notes...
Страница 170: ...Water Systems 9 12 Notes...
Страница 171: ...Waste Systems Chapter 10 MH31 MARLOW HUNTER LLC V1 R01_121514...
Страница 172: ...Waste and Sanitation Systems i This Page Intentionally Left Blank...
Страница 181: ...Waste and Sanitation Systems 10 9 BILGE SUMP PUMP DRAIN SYSTEM LAYOUT Figure 10 17...
Страница 183: ...Waste and Sanitation Systems 10 11 BLACK WATER ENGINE COMPARTMENT BLOWER LAYOUT Figure 10 20...
Страница 184: ...Waste and Sanitation Systems 10 12 Notes...
Страница 185: ...MH31 Engines Transmissions Chapter 11 MARLOW HUNTER LLC and V1 R01_121514...
Страница 186: ...Engines and Transmissions i This Page Intentionally Left Blank...
Страница 188: ...Engines and Transmissions 11 2 Engines and Transmissions 11 2 Figure 11 2...
Страница 189: ...Engines and Transmissions 11 3 Figure 11 4...
Страница 197: ...Engines and Transmissions 11 11 Notes...
Страница 198: ...Engines and Transmissions 11 12 Notes...
Страница 199: ...and V1 R01_121514 MARLOW HUNTER LLC MH31 Sails Rigging Chapter 12...
Страница 200: ...Sails and Rigging i This Page Intentionally Left Blank...
Страница 214: ...Sails and Rigging 12 14 Figure 12 14 GENERAL RIG COMPONENTS...
Страница 215: ...Sails and Rigging 12 15 MAINSAIL JIB SPECIFICATIONS Figure 12 15...
Страница 220: ...Sails and Rigging 12 20 Figure 12 21 MAINSHEET BOOM OUTHAUL LAYOUT...
Страница 222: ...Sails and Rigging 12 22 VANG LAYOUT CONVENTIONAL SOLID Figure 12 23...
Страница 224: ...Sails and Rigging 12 24 Figure 12 25 SPINNAKER LAYOUT OPTION...
Страница 225: ...Sails and Rigging 12 25 Figure 12 26 GENERALIZED REEFING LAYOUT...
Страница 226: ...Sails and Rigging 12 26 LAZY JACK LAYOUT WITH OPTIONAL STACK PACK SAIL COVER Figure 12 27...
Страница 227: ...Sails and Rigging 12 27 STACK PACK SAIL COVER INSTALLATION WITH LAZY JACKS Figure 12 28...
Страница 228: ...Sails and Rigging 12 28 Notes...
Страница 229: ...MH31 Getting Underway Chapter 13 MARLOW HUNTER LLC V1 R01_121514...
Страница 230: ...Getting Underway i This Page Intentionally Left Blank...
Страница 236: ...Getting Underway 13 6 Notes...
Страница 237: ...MH31 Maintenance Chapter 14 MARLOW HUNTER LLC V1 R01_121514...
Страница 238: ...Maintenance i This Page Intentionally Left Blank...
Страница 253: ...Maintenance 14 15 SLING LOCATIONS Figure 14 3...
Страница 254: ...Maintenance 14 16 Notes...
Страница 255: ...Glossary Chapter 15 MH31 MARLOW HUNTER LLC V1 R01_121514...
Страница 256: ...Glossary i This Page Intentionally Left Blank...