Sails and Rigging
12.6
From the sheet stopper the line can then be used by the
winch for additional torque when reefing
12.6.13 Reef Line 2
Reef line 2 lowers the mainsail to the second reef point.
The line arrangement is the same as Reef Line 1 (above)
except for the reef points are at the second cringle and
the line is routed port side.
12.6.14 Spinnaker Sheets
The spinnaker sheets are a pair of lines that control the
spinnaker clew and the shape of the sail. One of which
is used at a given time. Each line is attached to the
spinnaker clew with one line running around the outer
shroud and lifelines aft to the spinnaker block located on
the arch. The other sheet is routed around the forestay,
outer shroud and lifelines to the opposite spinnaker block.
Each line ends at a helm winch which can be used for
additional torque when trimming.
12.7 Rigging the Boat
Your new Marlow-Hunter boat will be fully rigged by your
dealer during the commissioning process. This includes
stepping the mast with standing rigging in place, attach-
ing the boom, installing sails with running rigging in place
and tuning the mast.
Stepping and unstepping the mast will inevitably be part
of sailboat ownership. Seasonal or long term storage,
bridge clearance or repairs may require de-rigging the
boat. The following will discuss the process of rigging
the sailboat. De-rigging the boat will essentially be the
reverse process. Please refer to the rigging manufactur-
er’s OEM manual for additional details on stepping and
tuning the mast.
12.7.1 Prep the Rig
Lay the mast onto two trestles or other appropriate
support with luff groove (aft mast) face up. Place the
boom and optional solid vang onto two other trestles
or supports.
Verify or mount the mast spreaders (see the spar
manufacturer’s OEM Operational Manual). Ensure
the mast is elevated enough so spreaders are off the
ground.
Wash mast, boom and optional solid vang with a
1.
2.
3.
mild detergent solution. Lubricate moving parts (i.e.
sheaves, etc) with a silicon spray lubricant.
Check halyard installation based on the type of rig
(conventional or in-mast furling) and optional sails
(spinnaker).
Verify halyard control ends exit the mast either port
or starboard as noted in Figures 12.19 and 12.20.
Clean and lubricate any shackles.
Verify and test electronic components (anchor light,
steaming light and optional wind instrument) installed
on the mast are wired properly. Use a 12V battery to
test.
Verify or install any non-electrical components to the
mast-head (i.e. windex, aerials, etc).
Clean and lubricate all standing rigging turnbuckles.
Verify or attach all standing rigging (Figures 12.16
and 12.17). All adjustable shrouds should be slack.
The lower ends of the V1s and D1s will be loose (later
installed to the chainplates after stepping).
12.7.2 Pre-Bend the Mast
NOTE: Never use anything more than a pair of wrenches to tighten
your rigging. Using an extended piece of pipe on the handle of a wrench
can over-tighten the rigging and possibly damage the mast or rigging.
Tighten the reverse diagonals RD1 followed by RD2
by the same number of turns to induce the mast
bend.
Measure the bend by tensioning a line or the main
halyard between the masthead and the gooseneck.
The maximum amount of bend should be no more
than 6” to 8” for the standard mast and 2” to 3” for
the furling mast as measured perpendicular from the
face of the mast to the halyard at the deepest part
of the bend. It can measure less, based on the sail
shape and your own preference.
Ensure the bend is evenly distributed along the mast
to give a smooth shape.
Ensure the mast is also straight from side to side.
Tighten or loosen the RDs to achieve this. (Note:
Always maintain loose D2s until the mast is stepped
(see below) and subsequently adjusted from the
bosums seat.)
Lash the V1s and D1s to the bottom of the mast to
prevent their swinging when craning the mast.
Attach the jib furler assembly to the mast forestay
fitting.
4.
5.
6.
7.
8.
9.
1.
2.
3.
4.
5.
6.
Содержание MH31
Страница 1: ...31 31 H V1 R01_121514 Operator s Manual U N T E R M A R L O W MH31 MARLOW HUNTER LLC...
Страница 2: ......
Страница 11: ...Introduction Chapter 1 MH31 MARLOW HUNTER LLC V1 R01_121514...
Страница 12: ...Introduction i This Page Intentionally Left Blank...
Страница 17: ...Introduction 1 5 Notes...
Страница 18: ...Introduction 1 6 Notes...
Страница 19: ...Documents Forms Chapter 2 MH31 MARLOW HUNTER LLC and V1 R01_121514...
Страница 20: ...Documents and Forms This Page Intentionally Left Blank i...
Страница 31: ...Documents and Forms 2 11 Float Plan 1 1 Figure 2 4...
Страница 44: ...Documents and Forms 2 24 Power Squadron recommendations for maintenance and safe boating...
Страница 45: ...Documents and Forms Local sailing club or marina s recommendations for maintenance and up keep 2 25...
Страница 46: ...Documents and Forms 2 26 Dates of practice drills and onboard safety inspections...
Страница 47: ...Documents and Forms My personal preferences for maintenance items safety gear 2 27...
Страница 48: ...Documents and Forms 2 28 Notes...
Страница 49: ...Limited Warranty Chapter 3 MH31 MARLOW HUNTER LLC V1 R01_121514...
Страница 50: ...This Page Intentionally Left Blank Limited Warranty 3 2...
Страница 64: ...Limited Warranty 3 16 Notes...
Страница 65: ...Boating Safety Chapter 4 MH31 MARLOW HUNTER LLC V1 R01_121514...
Страница 66: ...Boating Safety i This Page Intentionally Left Blank...
Страница 86: ...Boating Safety 4 20 MH31 DECK HARDWARE LAYOUT Figure 4 9...
Страница 89: ...Boating Safety 4 23 Notes...
Страница 90: ...Boating Safety 4 24 Notes...
Страница 91: ...Fuel Systems Chapter 5 MH31 MARLOW HUNTER LLC V1 R01_121514...
Страница 92: ...This Page Intentionally Left Blank Fuel Systems i...
Страница 102: ...Figure 5 11 FUEL SYSTEM LAYOUT WITH OPTIONAL GENERATOR Fuel Systems 5 10...
Страница 103: ...LPG SYSTEM LAYOUT Figure 5 12 Fuel Systems 5 11...
Страница 104: ...Notes Fuel Systems 5 12...
Страница 105: ...MH31 Underwater Gear Chapter 6 V1 R01_121514 MARLOW HUNTER LLC...
Страница 106: ...Underwater Gear i This Page Intentionally Left Blank...
Страница 113: ...Underwater Gear 6 7 Figure 6 15 Figure 6 16...
Страница 115: ...Underwater Gear 6 9 INTAKES DISCHARGES BELOW WATERLINE Figure 6 17...
Страница 117: ...Underwater Gear 6 11 Notes...
Страница 118: ...Underwater Gear 6 12 Notes...
Страница 119: ...DC Electric System Chapter 7 MH31 MARLOW HUNTER LLC V1 R01_121514...
Страница 120: ...DC Electric Systems i This Page Intentionally Left Blank...
Страница 137: ...DC Electric Systems 7 17 DC OUTLET LAYOUT Figure 7 21...
Страница 138: ...DC Electric Systems 7 18 Notes...
Страница 139: ...MARLOW HUNTER LLC MH31 AC Electric System Chapter 8 V1 R01_121514...
Страница 140: ...AC Electric Systems i This Page Intentionally Left Blank...
Страница 153: ...AC Electric Systems 8 13 AC SYSTEM MAJOR COMPONENT GENERAL LAYOUT WITH INVERTER Figure 8 18...
Страница 155: ...AC Electric Systems 8 15 AIR CONDITIONER DUCTING LAYOUT Figure 8 20...
Страница 156: ...AC Electric Systems 8 16 Notes...
Страница 157: ...MARLOW HUNTER LLC MH31 Water Systems Chapter 9 V1 R01_121514...
Страница 158: ...Water Systems i This Page Intentionally Left Blank...
Страница 166: ...Water Systems 9 8 FRESH WATER LAYOUT Figure 9 14...
Страница 168: ...Water Systems 9 10 STANDARD TOILET AND OPTIONAL AIR CONDITIONING RAW WATER LAYOUT Figure 9 15...
Страница 169: ...Water Systems 9 11 Notes...
Страница 170: ...Water Systems 9 12 Notes...
Страница 171: ...Waste Systems Chapter 10 MH31 MARLOW HUNTER LLC V1 R01_121514...
Страница 172: ...Waste and Sanitation Systems i This Page Intentionally Left Blank...
Страница 181: ...Waste and Sanitation Systems 10 9 BILGE SUMP PUMP DRAIN SYSTEM LAYOUT Figure 10 17...
Страница 183: ...Waste and Sanitation Systems 10 11 BLACK WATER ENGINE COMPARTMENT BLOWER LAYOUT Figure 10 20...
Страница 184: ...Waste and Sanitation Systems 10 12 Notes...
Страница 185: ...MH31 Engines Transmissions Chapter 11 MARLOW HUNTER LLC and V1 R01_121514...
Страница 186: ...Engines and Transmissions i This Page Intentionally Left Blank...
Страница 188: ...Engines and Transmissions 11 2 Engines and Transmissions 11 2 Figure 11 2...
Страница 189: ...Engines and Transmissions 11 3 Figure 11 4...
Страница 197: ...Engines and Transmissions 11 11 Notes...
Страница 198: ...Engines and Transmissions 11 12 Notes...
Страница 199: ...and V1 R01_121514 MARLOW HUNTER LLC MH31 Sails Rigging Chapter 12...
Страница 200: ...Sails and Rigging i This Page Intentionally Left Blank...
Страница 214: ...Sails and Rigging 12 14 Figure 12 14 GENERAL RIG COMPONENTS...
Страница 215: ...Sails and Rigging 12 15 MAINSAIL JIB SPECIFICATIONS Figure 12 15...
Страница 220: ...Sails and Rigging 12 20 Figure 12 21 MAINSHEET BOOM OUTHAUL LAYOUT...
Страница 222: ...Sails and Rigging 12 22 VANG LAYOUT CONVENTIONAL SOLID Figure 12 23...
Страница 224: ...Sails and Rigging 12 24 Figure 12 25 SPINNAKER LAYOUT OPTION...
Страница 225: ...Sails and Rigging 12 25 Figure 12 26 GENERALIZED REEFING LAYOUT...
Страница 226: ...Sails and Rigging 12 26 LAZY JACK LAYOUT WITH OPTIONAL STACK PACK SAIL COVER Figure 12 27...
Страница 227: ...Sails and Rigging 12 27 STACK PACK SAIL COVER INSTALLATION WITH LAZY JACKS Figure 12 28...
Страница 228: ...Sails and Rigging 12 28 Notes...
Страница 229: ...MH31 Getting Underway Chapter 13 MARLOW HUNTER LLC V1 R01_121514...
Страница 230: ...Getting Underway i This Page Intentionally Left Blank...
Страница 236: ...Getting Underway 13 6 Notes...
Страница 237: ...MH31 Maintenance Chapter 14 MARLOW HUNTER LLC V1 R01_121514...
Страница 238: ...Maintenance i This Page Intentionally Left Blank...
Страница 253: ...Maintenance 14 15 SLING LOCATIONS Figure 14 3...
Страница 254: ...Maintenance 14 16 Notes...
Страница 255: ...Glossary Chapter 15 MH31 MARLOW HUNTER LLC V1 R01_121514...
Страница 256: ...Glossary i This Page Intentionally Left Blank...