Step 2:
Put a second positioning jig on the track. The exact location of the second jig
is determined by hanging the catenary wire. Important: Always use the moun-
ting eyelets on the side of the catenary wire, which are on the subsequently
continuous straight side on the bottom of the catenary wire. Always hang the
catenary wire on the pins, which are pointing to the mast.
Step 3:
Check with the catenary wire deviation jig to make sure that the catenary wire
is always within the two markings on the jig.
28
4. Information about Installation
Содержание H0-Oberleitung
Страница 1: ...Anleitung zur Märklin H0 Oberleitung ...
Страница 73: ...73 6 Caténaire électriquement fonctionnelle 6 Functionerende bovenleiding 70221 ...
Страница 78: ...78 8 Beispiele für Gleispläne mit Oberleitung 8 Examples of Track Plans with Catenary ...
Страница 79: ...79 8 Exemples pour plans de voies avec caténaire 8 Voorbeelden voor railplannen met bovenleiding ...
Страница 80: ...80 8 Beispiele für Gleispläne mit Oberleitung 8 Examples of Track Plans with Catenary ...
Страница 81: ...81 8 Exemples pour plans de voies avec caténaire 8 Voorbeelden voor railplannen met bovenleiding ...
Страница 82: ...82 8 Beispiele für Gleispläne mit Oberleitung 8 Examples of Track Plans with Catenary ...
Страница 83: ...83 8 Exemples pour plans de voies avec caténaire 8 Voorbeelden voor railplannen met bovenleiding ...
Страница 85: ...85 ...
Страница 86: ...86 ...
Страница 87: ...87 ...
Страница 88: ...Gebr Märklin Cie GmbH Postfach 8 60 D 73008 Göppingen www maerklin com 03 04 he fh Änderungen vorbehalten ...