Step 1:
Place a positioning jig over the last mast base that has been installed on the
track. Fix this mast base in place with a positioning pin. When the first mast is
supposed to be set up, its exact location is given with the positioning jig that
has been put into position and the mast base can be screwed down on the
marked location. Using a thin screwdriver, you can drive a mounting screw for
the mast base through the corresponding hole for the positioning pin in the jig.
Important:
Please note: The inner hole
➁
in the positioning jig is for the position of the
standard masts. The outer hole
➃
is for the position of the tower masts.
27
Содержание H0-Oberleitung
Страница 1: ...Anleitung zur Märklin H0 Oberleitung ...
Страница 73: ...73 6 Caténaire électriquement fonctionnelle 6 Functionerende bovenleiding 70221 ...
Страница 78: ...78 8 Beispiele für Gleispläne mit Oberleitung 8 Examples of Track Plans with Catenary ...
Страница 79: ...79 8 Exemples pour plans de voies avec caténaire 8 Voorbeelden voor railplannen met bovenleiding ...
Страница 80: ...80 8 Beispiele für Gleispläne mit Oberleitung 8 Examples of Track Plans with Catenary ...
Страница 81: ...81 8 Exemples pour plans de voies avec caténaire 8 Voorbeelden voor railplannen met bovenleiding ...
Страница 82: ...82 8 Beispiele für Gleispläne mit Oberleitung 8 Examples of Track Plans with Catenary ...
Страница 83: ...83 8 Exemples pour plans de voies avec caténaire 8 Voorbeelden voor railplannen met bovenleiding ...
Страница 85: ...85 ...
Страница 86: ...86 ...
Страница 87: ...87 ...
Страница 88: ...Gebr Märklin Cie GmbH Postfach 8 60 D 73008 Göppingen www maerklin com 03 04 he fh Änderungen vorbehalten ...