INSTALLATION AND OPERATION MANUAL AND PARTS LIST,
MODELS: STHE-7-TGG, STHE-12-TGG, STHE-16-TGG
PART NUMBER 10225R0
13
2010-09-07
4.0 OPERATION INSTRUCTIONS
LIGHTING
1. Ensure power, gas and water supply is on.
2. Turn power switch “ON”.
3. Steam generator tanks will begin filling with water.
4. Once proper water level has been reached, the ignition light will come on and should remain
on until the ready light comes on.
5. Cooker is now ready for use.
Your steamer has been factory set, when “ON” to maintain water temperature during the
READY phase at approximately 205º Fahrenheit (97º Celsius) just below water boiling point.
WARNING: In the event of main burner ignition failure, a 5 minute
purge period must be observed prior to re-establishing ignition
source.
WARNING: In the event a gas odor is detected, shut down
equipment at the main shut off valve and contact the local gas
company or gas supplier for service.