Dispenser Set-Up
Page 36
MDE-3883 TRIND Retrofit Kits C00011-005
• 10/00
PRELIMINARY
FCC 11/30
Testing TRIND™
1
For The Advantage series units, if printer was removed, replace printer and reconnect two
cables and ground.
2
Restore power to unit. Refer to Pump and Dispenser Service Manual MDE-2531.
3
Restoring power with new BIOS will Cold Start the CRIND. Refer to CRIND
Service Manual MDE-2562.
Note: Cold Start is required if TRIND equipment is installed or changed.
4
Present test tag at option door from a distance of 6’’ or less. Light board should
light and flash sequentially and emit one beep. A screen prompt should appear.
Note: If light does not function properly, check to see if opposite side of unit was
activated, indicating a crossed cable.
5
When using test tag, screen will show “Test Confirmed”. In regular operation,
screen will display instructions to begin fueling.
Completing Installation
1
Close and secure option and maindoor.
2
Install graphics. Refer to MDE-2620 Graphics Installation for The Advantage
Series.
3
Peel backing paper off FCC label pate provided in kit.
4
Affix FCC label plate to inside frame sheathing on column under existing FCC
label.
5
Restore power to unit. Refer to Pump and Dispenser Service Manual MDE-2531.