2 MAINTENANCE
SUPPORTING OF PLATEN
BALE CHAM-
BER DOOR,
OPEN
FEED GATE OPEN -
PLATEN IN UP
POSITION
DISCONNECT
IN
OFF
POSI-
TION AND
LOCKED-OUT
4” X 4” WOOD
BEAM IN EACH
REAR CORNER
FRONT VIEW OF BALER
WARNING:
BEFORE ENTERING BALE CHAMBER FOR SERVICE, BE SURE THAT
THE PLATEN IS SECURELY SUPPORTED. AT A MINIMUM, USE TWO WOODEN
4” X 4” BEAMS (GOOD CONDITION), CUT TO FIT SNUG IN EACH REAR CORNER
OF THE CHAMBER WHILE SUPPORTING THE PLATEN IN THE UP POSITION. THE
TOP END OF EACH BEAM SHOULD BE IN THE EXTREME CORNER, WHILE THE
BOTTOM END SHOULD BE POSITIONED OVER THE OUTER TIE SLOT IN THE
FLOOR. SEE DIAGRAM BELOW.
DANGER:
DO NOT CLIMB ON SIDES OF BALER. USE A LADDER OR WORK
PLATFORM WHEN WORKING ON TOP OF THE BALER OR OTHER AREAS OF THE
BALER THAT CAN NOT BE REACHED FROM GROUND LEVEL.
WARNING:
PARTS OF THE PLATEN WILL EXTEND ABOVE THE TOP OF THE
BALER WHEN THE PLATEN IS FULLY RAISED.
BEAM OVER
OUTER TIE
SLOT IN FLOOR
2-2
Содержание V-4830
Страница 38: ...2 MAINTENANCE PANEL BOX FOR HD AND LP BALERS 2 14...
Страница 39: ...2 MAINTENANCE PANEL BOX FOR V 6030 V 4830 TRANSFORMER PRINTED CIRCUIT BOARD IEC MOTOR STARTER 2 15...
Страница 43: ...2 MAINTENANCE HYDRAULIC SCHEMATIC FOR VERTICAL BALERS TYPICAL 2 19...
Страница 44: ...2 MAINTENANCE HYDRAULIC SCHEMATIC FOR V 6042LP 2 20...