MyPower VG2000 V4 VoIP Gateway Installation Manual
Page
61 / 72
horizontally. Aim the supporting bracket installation
hole to the corresponding hole on the device side and
fix the supporting brackets to the both two sides of the
device using screws.
Step 3: Check whether the cabinet bracket is installed
tightly and horizontally.
Step 3: Install VG2000-64S VoIP gateway device to the
cabinet.
Step 1: The front side of the device faces the handler.
Use hands to stably hold the device and keep the
device horizontally. Carefully place the device on the
supporting bracket or supporting board from the front
side of the cabinet. Please avoid the device and cabinet
upright post collision during placing.
Step 2: Push the device using two hands and keep the
supporting bracket of the device closely attached to
the cabinet upright post surface.
Step 3: Use a fixed screw to install the device on the
upright post of the device.
Step 4: Check whether the device is installed tightly
and straightly.
Step 5: Check the space between the installed devices.
Choose an appropriate blank panel (standard cabinet
accessory) and place it in the space between two
devices. Use a screw to fix the blank panel on the
cabinet.
Caution
Installation suggestions: