MyPower VG2000 V4 VoIP Gateway Installation Manual
Page
37 / 72
plane. Keep at least 10cm space around the device to ensure
enough heat dissipation space. It is recommended to install
the air conditioner in the area with hot summer. The
installation process is as follows:
Step 1: Check the cabinet.
Before installing the device, reserve enough empty slot
space for installing the device.
Use a ruler or tapeline to measure the horizontal
installation hole center distance and horizontal direction
installation net space of the cabinet. The size should
comply with the following figure.
Figure 4-6 Cabinet dimension
Check whether the supporting board and bracket,
floating nut, fixed screw, and blank panel of the cabinet
are complete, which are standard accessories of the
cabinet. The accessory size or shape varies with
different
cabinets.
Therefore,
for
the
cabinet
accessories, contact the cabinet supplier to provide the
original accessories.