4
MPT-333
Contents
Receipt of goods, transport and storage
Unpacking, scope of delivery and identification
Specifying the installation position
Setting up foundation and placing empty conduits
Setting up foundation and placing empty conduits 35
Foundation and empty conduit plan for base frame
Foundation and empty conduit plan
Assembling and mounting the base frame
Preliminary work for installation directly on the foundation
Assembling the locking comb and cage half
Assembly of an optional mounting pillar
Содержание MPT-333
Страница 1: ...Operating Instructions Full Height Turnstile MPT 333 Doc ID 5817 0028EN Version 00...
Страница 17: ...17 MPT 333 Technical data Mag00867 60 Fig 2 Dimensions MPT 333 side view dimensions in mm lighting optional...
Страница 54: ...54 MPT 333 Assembly Installing the mounting pillar Mag00899 Fig 24 Mounting pillar and attachment material...
Страница 59: ...59 MPT 333 Assembly 5 Align the mounting pillar by turning it Mag00904 Fig 29 Aligning the mounting pillar...
Страница 89: ...89 MPT 333...
Страница 90: ...90 MPT 333...
Страница 91: ...91 MPT 333...