33
MPT-333
Assembly
7.3
Required steps
The following work steps must be carried out before assembly:
›
Specify the installation position.
ä
›
Set up foundation and placing empty conduits.
ä
The following work steps must be carried out during assembly:
›
Unpack the turnstile.
ä
›
Assemble and mount optional base frame.
ä
›
Assemble cage half and locking comb.
ä
›
Assemble the support beam.
ä
›
Assemble the centre pillar.
ä
›
Assembly of an optional mounting pillar for access-control devices.
ä
›
Connect the turnstile electrically.
ä
›
Install and connect access-control devices.
ä
7.4
Specifying the installation position
The turnstile MPT-333 is available in the versions "Entrance side right" and "En-
trance side left".
ä
The layout of the components depends on the version ordered. The service
door in the support beam should point towards the zone controlled.
Содержание MPT-333
Страница 1: ...Operating Instructions Full Height Turnstile MPT 333 Doc ID 5817 0028EN Version 00...
Страница 17: ...17 MPT 333 Technical data Mag00867 60 Fig 2 Dimensions MPT 333 side view dimensions in mm lighting optional...
Страница 54: ...54 MPT 333 Assembly Installing the mounting pillar Mag00899 Fig 24 Mounting pillar and attachment material...
Страница 59: ...59 MPT 333 Assembly 5 Align the mounting pillar by turning it Mag00904 Fig 29 Aligning the mounting pillar...
Страница 89: ...89 MPT 333...
Страница 90: ...90 MPT 333...
Страница 91: ...91 MPT 333...