36
MPT-333
Assembly
7.5.4
Foundation and empty conduit plan for base frame FURA T3
1800
188
1110
1410
1612
13
1
600
90
0
1369
1500
91
140
F
F
F
F
F
F
F
F
F
F
F
F
N
N
N
N
LR
LR
LR
LR
1257.5
75
0
Mag00894
2
1
3
4 5
6
Fig. 10: Foundation and empty conduit plan for base frame FURA T3 – top view
(dimensions in mm)
1 Base frame FURA T3
2 Foundation C35/45 XD3 XF2 with reinforcement, foundation depth: at least 800 mm,
frost-proof
3 F: Foundation anchors (12 pieces), holes for sleeves with inner thread
Hilti HIS-RN M10 x 110 A4: Drilling diameter 18 mm, drilling depth 110 mm
4 LR: Possible position for empty conduits. Lay empty conduits separately for mains
cable and control lines. Allow empty conduits to protrude approx. 50 mm above
foundation and lines to protrude at least 5 m from the empty conduits.
5 N: Levelling screws to align the base frame
6 Passage
Содержание MPT-333
Страница 1: ...Operating Instructions Full Height Turnstile MPT 333 Doc ID 5817 0028EN Version 00...
Страница 17: ...17 MPT 333 Technical data Mag00867 60 Fig 2 Dimensions MPT 333 side view dimensions in mm lighting optional...
Страница 54: ...54 MPT 333 Assembly Installing the mounting pillar Mag00899 Fig 24 Mounting pillar and attachment material...
Страница 59: ...59 MPT 333 Assembly 5 Align the mounting pillar by turning it Mag00904 Fig 29 Aligning the mounting pillar...
Страница 89: ...89 MPT 333...
Страница 90: ...90 MPT 333...
Страница 91: ...91 MPT 333...