35
MPT-333
Assembly
7.5.3
Setting up foundation and placing empty conduits
1. Excavate the foundation hole according to the foundation and empty con-
duit plan.
2. Place empty conduits according to the foundation and empty conduit plan
in the foundation hole.
3. Close empty conduit to prevent water from entering.
4. Concrete the foundation.
5. Create smooth coating.
6. Let concrete cure.
7. Apply moisture protection for outdoor installation.
Foundation and empty conduit plan for base frame FURA T3:
ä
10.
ä
Foundation and empty conduit plan for direct mounting:
ä
ä
Содержание MPT-333
Страница 1: ...Operating Instructions Full Height Turnstile MPT 333 Doc ID 5817 0028EN Version 00...
Страница 17: ...17 MPT 333 Technical data Mag00867 60 Fig 2 Dimensions MPT 333 side view dimensions in mm lighting optional...
Страница 54: ...54 MPT 333 Assembly Installing the mounting pillar Mag00899 Fig 24 Mounting pillar and attachment material...
Страница 59: ...59 MPT 333 Assembly 5 Align the mounting pillar by turning it Mag00904 Fig 29 Aligning the mounting pillar...
Страница 89: ...89 MPT 333...
Страница 90: ...90 MPT 333...
Страница 91: ...91 MPT 333...