76
MPT-333
Corrective action
11.3
Maintenance schedule
The maintenance plan lists all work required to ensure safe, optimum and trou-
ble-free operation of the pedestrian gate.
Interval
Work
Personnel
Monthly
Check the pedestrian gate for damage from
the outside.
Operator
Every 6 months
Check centre pillar, cage half and locking comb
for damage.
Technician
Check support beam for damage from inside
and outside. If necessary, clean support beam
and correct defect in paint work.
Technician
Check play on the floor bearing and ease of
movement. Adjust play if necessary.
Technician
Check the function of the locking.
Technician
Check screwed connection on the drive flange. Technician
Check function of the external residual current
operated device
Electrical specialist
Every 12 months
Check electrical lines for damage.
Electrical specialist
Check if all electrical connections are firm.
Electrical specialist
Check signs and labels for completeness and
legibility.
Technician
Check foundation fastening.
Technician
According to the opera-
tor
Check emergency function.
Operator
Table 8:
Maintenance schedule
12
Corrective action
IMPORTANT!
For troubleshooting see separate document "Description of MGC
control unit for MPT-333 Full Height Turnstile (Doc.ID:
5817,0027)".
Содержание MPT-333
Страница 1: ...Operating Instructions Full Height Turnstile MPT 333 Doc ID 5817 0028EN Version 00...
Страница 17: ...17 MPT 333 Technical data Mag00867 60 Fig 2 Dimensions MPT 333 side view dimensions in mm lighting optional...
Страница 54: ...54 MPT 333 Assembly Installing the mounting pillar Mag00899 Fig 24 Mounting pillar and attachment material...
Страница 59: ...59 MPT 333 Assembly 5 Align the mounting pillar by turning it Mag00904 Fig 29 Aligning the mounting pillar...
Страница 89: ...89 MPT 333...
Страница 90: ...90 MPT 333...
Страница 91: ...91 MPT 333...