background image

record PROTECT full turn

User manual

Translation of the original manual

Содержание BA 120

Страница 1: ...record PROTECT full turn User manual Translation of the original manual ...

Страница 2: ...opyright 8 2 4 Product identification 8 2 5 Manufacturer agtatec ag 8 2 6 Target groups 8 3 Description 10 3 1 Product Description 10 3 2 Model Build Variations 10 3 3 Technical Specification 12 3 4 Standard Technical Specification 12 3 5 Alternative options and Accessories 13 4 Operation 15 4 1 Instructions for Use 15 4 2 Customer Instructions for use 16 4 3 Fail State 17 4 4 Access Control Devic...

Страница 3: ...ous injury or death 1 2 Intended purpose of use The system is designed exclusively for use as a pedestrian passage The installation may only occur in dry areas If there are deviations then proper waterproofing and water drains will be required on site Any other application or use beyond this purpose is not considered to be an intended purpose The manufacturer bears no liability for any resulting d...

Страница 4: ...t or inattentive cleaning or care of the system can lead to malfunctions damage to property or injury to persons ð Check the sensors regularly for dirt and clean them if necessary ð Regularly remove dirt accumulations in the floor rail or under the floor mat ð Keep the system free of snow and ice ð Do not use aggressive or caustic cleaning agents ð Use road salt or loose chippings only conditional...

Страница 5: ... malfunctions damage to property or risk of injury if used by unauthorised persons a If unauthorised persons use the system there is a risk of malfunction damage to property or in jury to persons ð Children under 8 years of age may only use the system under supervision ð Children must not play with or on the system or clean and maintain it ð Persons with limited physical sensory or mental abilitie...

Страница 6: ...ts options and diameter comply with the requirements of the Machine Guidelines 2006 42 EG as well as EN 16005 and DIN 18650 D Nevertheless danger may arise if not used as intended IMPORTANT Installation commissioning inspection maintenance and repair work may only be conducted by qualified trained and authorized technicians After commissioning or repair work fill in the check list and give it to t...

Страница 7: ...orking environment the protective equipment varies and must be adapted accordingly In addition to protective equipment for specific work the work site may require other protective equipment for example a harness In hygiene protected areas special or additional requirements of personal protective equipment may be required These requirements must be considered when choosing personal protective equip...

Страница 8: ...in the drawings 2 2 Document identification Name BAL_PROTECT_full_turn_EN_1V0_REC_102 905401101 Version V1 0 Article nr 102 905401101 Publication date 03 2021 2 3 Copyright The copyright of the instructions remain at agtatec ag It is prohibited to reproduce distribute or use the manuals for purpose of competition without the writ ten authorization of agtatec ag Violation of the here stated copyrig...

Страница 9: ...turn_EN_1V0_REC_102 905401101 9 20 Operating entity of the system the person who is responsible for the technical maintenance of this system Operator of the system the person who operates the system every day and has been suitably instructed ...

Страница 10: ... control device specified by the client at the time of order The full turn is controlled by the Titan mechanical head and LL2001 logic platform which are secured in a weather proof containment box 3 2 Model Build Variations The following variations can be supplied by however this technical manual provides sufficient inform ation to cover all models BA Units Full turn BA Simple painted steel tubula...

Страница 11: ...cture The full height is delivered in kit form allowing reduced transport costs or in mono block form allowing reduced installation time and cost The full turn is available with a 90º and 120º rotor It is also available as Single rotor for one lane The EV Double Interlocking layout for two lanes also fully matches with the BA aesthetics EV 90 Single Evolution Model EV 120 Single Evolution Model ...

Страница 12: ... positive action lock which prevents two passages at one time A self centring mechanism to ensure complete rotation of the head to the reset home position An anti backup device prevents reverse rotation when the head has moved more than 32 from the reset home position 3 4 Standard Technical Specification Orientation Pass left or pass right Pass left available with locks on secure side Rotor Wings ...

Страница 13: ...s of the board are as follows One input for unlocking the Titan Lite FHT for transit in direction A One input for unlocking the Titan Lite FHT for transit in direction B Two pairs of protected outputs for driving the traffic lights Red and Green in directions A and B NOTICE Two pairs of protected outputs can be used for driving the Red and Green lights in direction A PL and B PR In this mode the r...

Страница 14: ...assembled option Traffic lights LED Down lights LED All units come with the blanking panel for traffic lights but if required the LEDs must be ordered separately as they are an optional extra Heel protection optional in black in Foamed nitrile rubber with polymeric covering for increased safety in use is available ...

Страница 15: ...C_102 905401101 15 20 4 Operation 4 1 Instructions for Use The information contained in this section should be used as a basis for the instruction of personnel in the correct use of the doors BA 90 Single BA 120 Single EV 90 Single EV 120 Single ...

Страница 16: ...ess a free entry exit option has been specified 2 Operate the Access Control Device if fitted 3 On the acceptance of a signal from the Access Control Device the rotor will unlock and be free to rotate in one direction 4 Pass through the full turn using your arms to manually push the rotor 5 The rotor will automatically lock in its new position once the passage has been completed Important Notices ...

Страница 17: ...oids and programmable parameters The fail state is the same as when a fire alarm signal is received 4 4 Access Control Devices can supply the mounting for an Access Control Device which is specified at the initial order to meet customer requirements 4 5 Programmable Parameters The system operation is conditioned by the values of the 8 trimmers stored in the LL2001 PCB Con trol Logic The system ope...

Страница 18: ... water and wipe dry Oil Grease marks all finishes Cleaning agent Organic solvents acetone alcohol genclene trichlorethane Action Clean after with soap and water rinse well with clean water and wipe dry Rust and other Corrosion products Stainless finishes Cleaning agent Oxalic acid The cleaning solution should be applied with a swab and al lowed to stand for 15 to 20 minutes before being washed awa...

Страница 19: ...ompletely disassembled in reverse order The automatic door mainly consists of the following materials Aluminum Linking profiles Gearbox Drive panel Door wing profiles and side profiles Various profiles and small parts Steel iron parts Stainless steel casing Floor panel Box recess for floor installation Optional spacer or reinforcement profiles Gear components springs Various small parts like fitti...

Страница 20: ...and www record de Denmark www record danmark dk España www record es France www record fr Malaysia www recorddoors my Polska pl record global Schweiz www record ch Sverige www record se Türkiye tr record global United States www recorddoors com record global export www record global Subject to technical modifications Copyright agtatec ag No 102 905401101 ...

Отзывы:

Похожие инструкции для BA 120