61
MPT-333
Assembly
7.9
Checking the assembly
After assembly, check the following points:
›
Are all foundation anchors firmly fixed?
›
Are all fastening screws firmly tightened?
›
Is the support beam earthed?
ä
›
Is the support beam closed with the cover?
›
Is the protective ground for the cover connected?
›
Is the protective ground for the service door connected?
›
Is the cover assembled correctly?
›
Is the service door in the cover closed?
Содержание MPT-333
Страница 1: ...Operating Instructions Full Height Turnstile MPT 333 Doc ID 5817 0028EN Version 00...
Страница 17: ...17 MPT 333 Technical data Mag00867 60 Fig 2 Dimensions MPT 333 side view dimensions in mm lighting optional...
Страница 54: ...54 MPT 333 Assembly Installing the mounting pillar Mag00899 Fig 24 Mounting pillar and attachment material...
Страница 59: ...59 MPT 333 Assembly 5 Align the mounting pillar by turning it Mag00904 Fig 29 Aligning the mounting pillar...
Страница 89: ...89 MPT 333...
Страница 90: ...90 MPT 333...
Страница 91: ...91 MPT 333...