![Made JUPITER X Скачать руководство пользователя страница 26](http://html1.mh-extra.com/html/made/jupiter-x/jupiter-x_user-manual_3311664026.webp)
26 / 33
3.2.2.ESC Mode Receiver Special Case
DE-ENERGISED ELECTRICAL DIAGRAM CHECK
Control of the inputs and outputs of an electrical cabinet using the
Rogowski coil
3.2.2.1.Connecting the earthing equipement (EE1) and
the transmitter
Connecting the Earthing equipment on the transmitter end:
Connect the earthing equipment in the substation (or in the
upstream electrical cabinet).
Connecting the injection clamps :
Connect clamps L1, L2 and L3 on the respective upstream phases
while respecting the direction of the arrows (all in the same
direction)