55
54
ASSEMBL
Y ON
THE C
ONSTRUCTIONSITE
CONNE
CTION PLAN
The following steps explain how to install the system accessories in flush-mounted boxes. When installing
the system accessories in a control cabinet, the work steps must be applied correspondingly.
1. Make sure that steps 1 - 12 are performed exclusively in the powered off state.
2. Unhinge the sash.
3. Position the frame next to the wall opening.
4. Feed the cables for all external connectors (e.g. wall switch and alarm system) into the box for the
INSTINCT Gateway.
5. Feed the power supply line into the box for the INSTINCT power supply.
CAT5e, CAT6 or equivalent
max. 30 m (max. 5 locks)
max. 10 m (max. 8 locks)
Standard
Shorten
Lengthen
blue-white not used
1. Remove the plug and unplug the connection cable into a terminal box.
2. Feed the extension line into the terminal box.
3. Insulate the individual wires and connect them with suitable connection terminals. The use of connector
sleeves is strongly recommended.
4. Mount the plug on the extension line according to the plug assignment.
1. Remove the plug.
2. Shorten the cable.
3. Insulate the individual wires.
4. Reconnect the wires according to the connector assignment (see table below). The use of connector
sleeves is strongly recommended.
INSTINCT connection cable
CAT5e / CAT6 cable
white
orange and orange-white
yellow
green-white
green
green
brown
brown and brown-white
grey
blue
Plug assignment
Connection diagram
3. Length adjustment of the connection cable
Assembly