background image

maco.eu

maco.eu/

instinct

INSTINCT by MACO

ASSEMBLY INSTRUCTIONS

TECHNOLOGY IN MOTION

Содержание INSTINCT

Страница 1: ...maco eu maco eu instinct INSTINCT by MACO ASSEMBLY INSTRUCTIONS TECHNOLOGY IN MOTION...

Страница 2: ...iew 16 17 Work steps in the door leaf 18 24 Work steps in the door frame 25 28 Commissioning with Test Kit 29 37 Commissioning 29 35 Prepare delivery status 36 37 Commissioning without Test Kit 38 47...

Страница 3: ...uctions Instructions for use The instructions for use contain important information on project planning installation commissioning operation and maintenance of the INSTINCT by MACO system This documen...

Страница 4: ...Guard 2 INSTINCT striker plate 3 INSTINCT Bluetooth module 4 INSTINCT System cable 5 INSTINCT System cable for frame side assembly 6000 mm 6 INSTINCT Gateway 7 INSTINCT Termination cable with or witho...

Страница 5: ...rk steps in the door frame 2 Connection of INSTINCT system cable and Bluetooth module NOTES ON CONNECTING AND DISCONNECTING THE PLUGS Connect the plug to the socket until the plug snaps into place By...

Страница 6: ...to ensure the proper functioning of the system 1 Remove the seal 2 Run the two cables through the seal 3 Plug the cables into the lock 4 Reattach the seal to the lock Connect all INSTINCT Guard Guard...

Страница 7: ...in the door frame 6 INSTINCT Guard Guard assembly PAY ATTENTION TO THE SYSTEM FOLDER Recommendations for suitable screws can be found in the profile specific system folder ASSEMBLY NOTES 1 Make sure t...

Страница 8: ...t Test Kit continues Work steps in the door leaf 1 INSTINCT striker plate assembly PAY ATTENTION TO THE SYSTEM FOLDER Recommendations for suitable screws can be found in the profile specific system fo...

Страница 9: ...Guard Guard 2 INSTINCT striker plate 3 INSTINCT Bluetooth module 4 INSTINCT System cable 5 INSTINCT cable transition 6 INSTINCT Interface 7 INSTINCT Termination cable with or without acoustic module 8...

Страница 10: ...r leaf 1 Milling checks PAY ATTENTION TO THE SYSTEM FOLDER For the positioning of the individual components and the drilling and milling patterns the specifications of the profile specific system fold...

Страница 11: ...he profile specific system folder before the INSTINCT Guard and Guard are wired 1 Feed the cable from the MACO open door access control through the milling at the appropriate position according to the...

Страница 12: ...nect all INSTINCT Guard Guard except the top last one according to the following procedure and position them in the milled holes Work steps in the door leaf 5 Connection of INSTINCT Guard Guard Varian...

Страница 13: ...in the INSTINCT Guard Guard for example by too long screws 3 Do not overtighten the screws to prevent the INSTINCT Guard Guard from twisting and to avoid stiffness This especially applies to the fixin...

Страница 14: ...on in the corresponding milling 1 Hang the sash in the frame 2 Connect both parts of the INSTINCT cable transition and then secure the connector with the enclosed screw Work steps in the door frame 2...

Страница 15: ...ocks in the frame connect the INSTINCT system cable for frame side assembly 6000 mm to the designated socket on the INSTINCT Test Kit 2b Locks in the sash connect the end of the INSTINCT cable transit...

Страница 16: ...ck proper functionality Thereafter the hooks must be unlocked again immediately by the motor Commissioning with Test Kit 6 Close the door The locks must run into the striker plates without any noise A...

Страница 17: ...THE CONTACT PRESSURE 1 Set the pin position according to default as per the system folder 2 Check the height adjustment Press the hook manually Close the door carefully and check for proper run in The...

Страница 18: ...in the frame or the INSTINCT cable transition locks in the sash from the INSTINCT Test Kit 11 Unplug the INSTINCT Test Kit from the power supply Control Output 2 lights up Control The day release must...

Страница 19: ...elease the sash must also be secured against uncontrolled opening during transport NOTES ON DELIVERY STATUS Day release must be activated Prepare delivery status 2 Provisionally attach the connection...

Страница 20: ...teway 2b Locks in the sash connect the end of the INSTINCT cable transition to the corresponding socket on the INSTINCT Gateway 3 Connect the INSTINCT UPS to the INSTINCT Gateway Commissioning without...

Страница 21: ...st be unlocked again immediately by the motor 8 Close the door The locks must run into the striker plates without any noise Check the proper functioning in day release mode and adjust the striker plat...

Страница 22: ...All locks lock at the same time To carry out the following commissioning steps an access control e g INSTINCT Bluetooth module or MACO openDoor access control must be connected Alternatively a tempor...

Страница 23: ...LE BRIDGE Press the clamp button to clamp the cable bridge Use a screwdriver to simplify the operation NOTE ON DAY RELEASE CONTROL The door must remain closed and must not pop open If it does the cont...

Страница 24: ...ay release the sash must also be secured against uncontrolled opening during transport NOTES ON DELIVERY STATUS Day release must be enabled Prepare delivery status 2 Provisionally attach the connectio...

Страница 25: ...ection for external components to activate deactivate the day release by 2 second uninterrupted actuation Function 2 Connection for external components for one time opening with upright locking of the...

Страница 26: ...tem cable for frame side assembly Cable recommendation CAT5e CAT6 Installation pipe 25 mm Connection diagram 1a Frame side assembly DIN rail View from the inside Extension with CAT5e CAT6 possible See...

Страница 27: ...ble INSTINCT system cable INSTINCT cable transition Cable recommendation CAT5e CAT6 Installation pipe 25 mm Connection diagram 2a Sash side assembly DIN rail View from the inside Extension with CAT5e...

Страница 28: ...cks max 10 m max 8 locks Standard Shorten Lengthen blue white not used 1 Remove the plug and unplug the connection cable into a terminal box 2 Feed the extension line into the terminal box 3 Insulate...

Страница 29: ...the box for the INSTINCT Gateway 6b Locks in the sash feed the end of the INSTINCT cable transition into the wall up to the box for the INSTINCT Gateway Assembly 7 Mount the frame in the wall opening...

Страница 30: ...INSTINCT system cable cable transition as well as all external components according to the connection diagram onto the INSTINCT Gateway and then install it in the designated box 11 Connect the INSTINC...

Страница 31: ...and install it in the designated box Assembly 13 Insert the door leaf into the door frame and connect the ends of the INSTINCT cable transition to each other The door remains open until the locks are...

Страница 32: ...ooks of the INSTINCT Guard Guard to check proper functioning The hooks must be unlocked immediately afterwards by the motor Commissioning 3 Test whether the locks respond properly to opening signals u...

Страница 33: ...se occurs the height of the pin can be adjusted manually 4 Close the door from the inside The locks must run into the striker plates without any noise Adjust the striker plate setting if necessary CON...

Страница 34: ...default as per the system folder 2 Check the height adjustment Press the hook manually Close the door carefully and check for proper run in There is a marking on the locking hook that simplifies adju...

Страница 35: ...code Created 11 2021 Changed 13 05 2022 Order No 759439 All rights and amendments reserved Mayer Co Beschl ge GmbH Alpenstra e 173 5020 Salzburg Austria T 43 662 6196 0 F 43 662 6196 1449 maco maco e...

Отзывы: