214603
203
Revision A
1007798
A
B
Figure 4.77: Lift Linkage
8.
Start the engine and lower the header onto the ground
until member (A) lifts off link (B) on both sides.
9.
Stop the engine and remove the key.
1000733
A
B
Figure 4.78: Lift Linkage
10. On high side, remove nut, washer, and bolt (A) that
attaches shims (B) to link.
11. Remove one or both shims (B), and reinstall the
hardware (A).
1000732
A
B
Figure 4.79: Lift Linkage
12. Start the engine and raise the header fully.
13. Stop the engine and remove the key from the ignition.
14. Move float pins to disengaged position.
15. Start the engine and set the header approximately 150
mm (6 in.) off ground and check that member (A) is
against link (B). Stop the engine and remove the key
from the ignition.
16. Measure distance to ground at both ends of the header.
17. If additional levelling is required, repeat Steps
to
and install the removed shim on the
opposite linkage.
NOTE:
If required, additional shims are available from your Dealer.
Содержание M205
Страница 3: ...Declaration of Conformity 1025029 ...
Страница 4: ...1025030 ...
Страница 20: ......
Страница 36: ...214603 16 Revision A Figure 1 23 Safety Signs Right Cab Forward Side 1011020 A B C D E F G H J K L M SAFETY ...
Страница 401: ...214603 381 Revision A Fuse Box Decal Figure 5 175 Fuse Decal 1022431 MAINTENANCE AND SERVICING ...
Страница 440: ......
Страница 462: ......
Страница 511: ...windshield wipers 56 INDEX ...
Страница 512: ......