
215015
59
Revision A
3.10
Installing Steps
NOTE:
Procedure for left side installation shown
—
right side installation similar.
1005712
A
B
Figure 3.62: Left Platform
1.
Remove two existing upper bolts (A).
2.
Ensure two lower bolts (B) are not threaded in fully.
1005711
A
B
Figure 3.63: Left Steps Installed
3.
Hang step assembly on lower bolts (B). Back off bolts, if
necessary.
4.
Install two bolts (A) in upper holes of step and platform.
5.
Torque all bolts to 20 Nm (15 lbf·ft).
6.
Repeat for opposite step assembly.
Содержание M155
Страница 17: ...Figure 2 EC Declaration of Conformity Windrower Lift Sling Page 2 of 2 1029879 215015 xv Revision A...
Страница 19: ...Figure 4 EC Declaration of Conformity Windrower Assembly Supports Page 2 of 2 1029881 215015 xvii Revision A...
Страница 20: ......
Страница 26: ......
Страница 36: ......
Страница 178: ......
Страница 196: ......
Страница 250: ......
Страница 268: ......
Страница 271: ......