Index
A
auger speed ............................................... 179
reel speed .................................................. 181
auger speed ............................................... 180
reel speed .................................................. 181
attaching........................................................ 148
auger speed................................................... 179
hydraulic center-link
attaching to M105 ....................................... 149
knife speed .................................................... 182
setting with expansion module ..................... 182
setting without expansion module................. 184
attaching to M105 ....................................... 154
air conditioning,
See
HVAC system
antenna mounting................................................ 51
API
nition.......................................................... 27
attaching A-Series header to M105
hydraulic center-link .................................... 149
mechanical center-link................................. 154
attaching D-Series header to M105 ................. 131
hydraulic center-link .................................... 131
mechanical center-link................................. 136
connecting batteries ....................................... 268
installing drive wheels..................................... 304
nition.......................................................... 27
auger speed ...................................................... 179
A30-D header ................................................ 179
A40-D header ................................................ 180
automated steering ............................................ 337
B
adding electrolyte ........................................... 265
boosting......................................................... 264
charging ........................................................ 262
connecting ..................................................... 268
installing ........................................................ 267
main disconnect switch ................................... 261
maintaining .................................................... 260
removing ....................................................... 266
safety ................................................................ 8
replacing .................................................... 257
tensioning................................................... 257
replacing .................................................... 256
tensioning................................................... 256
break-in inspection............................................. 313
C
CDM/WCM fault codes ..................................... 79
engine and windrower functions ........................ 60
engine error codes .................................... 79, 341
engine warning lights ........................................ 67
header functions............................................... 61
operating screens............................................. 62
programming.................................................... 70
warning/alarms................................................. 67
cab temperature,
See
HVAC system
California proposition 65......................................... 2
CanWin
error codes ................................................. 359
operating information screens ........................ 78
programming ................................................ 72
caster wheel,
See
wheel and tire
center-link ........................................................... 27
See also
hydraulic link
See also
mechanical link
nition.......................................................... 27
self-locking center-link hook mechanism .......... 126
accessing ...................................................... 282
replacing........................................................ 283
climate control system,
See
HVAC system
component location.............................................. 34
console ............................................................... 35
controls............................................................... 48
conversion chart ................................................ 201
cutting height..................................................... 127
D
attaching........................................................ 131
header boots .............................................. 168
attaching to M105........................................... 131
deck shift ....................................................... 178
draper index
setting draper index..................................... 173
draper speed.................................................. 171
Содержание M105
Страница 8: ......
Страница 28: ...SAFETY Figure 1 21 Safety Signs LH Side 169890 14 Revision A ...
Страница 30: ...SAFETY Figure 1 23 Safety Signs RH Side 169890 16 Revision A ...
Страница 40: ......
Страница 87: ...OPERATOR S STATION 169890 73 Revision A ...
Страница 88: ...OPERATOR S STATION 169890 74 Revision A ...
Страница 89: ...OPERATOR S STATION 169890 75 Revision A ...
Страница 90: ...OPERATOR S STATION 169890 76 Revision A ...
Страница 91: ...OPERATOR S STATION 169890 77 Revision A ...
Страница 92: ...OPERATOR S STATION Operating Information Screens 169890 78 Revision A ...
Страница 94: ......
Страница 299: ...MAINTENANCE AND SERVICING Fuse Box Decal Figure 5 169 Fuse Decal 169890 285 Revision A ...
Страница 350: ......
Страница 372: ......
Страница 382: ......
Страница 383: ......