Detaching a D-Series Header: Hydraulic Center-Link
To detach a D-Series header from an M-Series windrower equipped with a hydraulic center-link, follow these steps:
DANGER
Stop engine and remove key from ignition before
leaving operator's seat for any reason. A child or
even a pet could engage an idling machine.
1. Start engine and press HEADER UP (A) switch to raise
header to maximum height.
2. Rephase cylinders if one end of the header does not
raise fully. If rephasing is needed, proceed as follows:
a. Press and hold the HEADER UP (A switch until
both cylinders stop moving.
b. Continue to hold the switch for 3–4 seconds.
Cylinders are phased.
3. Stop engine and remove key.
Figure 4.104: GSL
4. Pull lever (A) and rotate toward header to lower safety
prop (B) onto cylinder. Repeat for opposite cylinder.
Figure 4.105: Safety Prop
169890
142
Revision A
Содержание M105
Страница 8: ......
Страница 28: ...SAFETY Figure 1 21 Safety Signs LH Side 169890 14 Revision A ...
Страница 30: ...SAFETY Figure 1 23 Safety Signs RH Side 169890 16 Revision A ...
Страница 40: ......
Страница 87: ...OPERATOR S STATION 169890 73 Revision A ...
Страница 88: ...OPERATOR S STATION 169890 74 Revision A ...
Страница 89: ...OPERATOR S STATION 169890 75 Revision A ...
Страница 90: ...OPERATOR S STATION 169890 76 Revision A ...
Страница 91: ...OPERATOR S STATION 169890 77 Revision A ...
Страница 92: ...OPERATOR S STATION Operating Information Screens 169890 78 Revision A ...
Страница 94: ......
Страница 299: ...MAINTENANCE AND SERVICING Fuse Box Decal Figure 5 169 Fuse Decal 169890 285 Revision A ...
Страница 350: ......
Страница 372: ......
Страница 382: ......
Страница 383: ......