HEADER OPERATION - D SERIES
Form 169552 / 169554 / 169555
97
Revision A
l. Disconnect reel hydraulics (H), and store on
bracket at windrower LH side.
m. Disconnect center-link as follows:
HYDRAULIC LINK
1. Start engine, and activate HEADER TILT
cylinder switch on GSL to release load on
center-link cylinder.
2. Disconnect center-link by lifting release (M),
and lift hook (N) off header.
NOTE
If optional center-link self-alignment kit is
installed, lift release (M), and then operate
the link lift cylinder with REEL UP switch
on GSL to disengage the center-link from
the header.
n. Slowly back windrower away from header.
NOTE
If hay conditioner is installed, watch
clearances on both sides.
MECHANICAL LINK
1. Loosen nut (J), and rotate barrel (K), to
relieve load on link.
2. Remove cotter pin on pin (L), and remove
pin to disconnect from windrower. Re-install
pin in header.
3. Tighten nut (J) against barrel. A slight tap
with a hammer is sufficient.
4. Proceed to step k. on next page.
(continued next page)
H
M
N
HEADER TILT UP
HEADER
TILT DOWN
REEL UP
REEL DOWN
L
K
J