214325
46
Revision A
Figure 3.69: 60/70 Series Harness Routing
3.
Route the switch harness (A) through the welded hose
guide on feeder house.
Figure 3.70: Switch Harness Routing
4.
Secure the switch harness (A) at multicoupler with a
cable tie. Leave 100 cm (40 in.) extending past
location (B).
Figure 3.71: Switch Harness Routing
5.
Route the switch harness (A) up to the underside of the
cab floor.
IMPORTANT:
To prevent damage to harness, ensure adequate slack
by lowering the feeder house fully before securing
harness with cable tie.
Содержание FFT FD75
Страница 2: ...FD75 FlexDraper Combine Header Published June 2017...
Страница 10: ......
Страница 24: ......
Страница 148: ......
Страница 188: ...214325 178 Revision A Figure 5 82 Combine Heads Up Display SETTING UP AUTO HEADER HEIGHT CONTROL...
Страница 282: ......
Страница 288: ......
Страница 304: ......
Страница 307: ......