9
01_IN.CSA.300_01 200220
P.01
0.00
+ 0.02
P.01
u.m.=m
5
6
7
2
4
3
1
8
GBR
Collocate the formwork supplied taking care to
place it fl at (centre the bubble) compared to the
road level.
Predispose a corrugated tube ø80 for the passage
of the electrical power cables in the pre-holes of
the formwork.
CAUTION: place the foundation formwork
based on the direction of traffi
c as in the view
from the above.
N.B:
Position the bollard so as to protrude 20mm from
the fl oor level (in order to limit the enter of rainwater
in the little well).
Gradually insert the concrete verifying that the hole is
fi lled uniformly. Deal the concrete so as to not to leave
empty pockets of air, especially below the bollard.
1. Screw off the 4 (four) bolts MA10x35 (using the Allen key
N°6).
2. Extract the trampling platform.
3. Insert the eyebolts M8.
4. Extract the extractable structure.
The weight of the extractable structure included the mechanic
pipe is 105 Kg (weight of the formwork: 35Kg).
To lift the extractable structure, it is necessary a lifting arm.
Lead the cables from the cockpit to the buried formwork.
Содержание C275A
Страница 11: ......
Страница 12: ......
Страница 13: ......
Страница 14: ......
Страница 15: ......
Страница 16: ......
Страница 17: ......
Страница 18: ......
Страница 19: ......
Страница 20: ......
Страница 21: ......
Страница 22: ......
Страница 23: ......
Страница 24: ......
Страница 37: ...info mac srl it 37 00_Manutenzione 05 200203 GBR...
Страница 38: ...www mac srl it 38 00_Manutenzione 05 200203 GBR...
Страница 39: ...info mac srl it 39 00_Manutenzione 05 200203 GBR...
Страница 40: ...www mac srl it 40 00_Manutenzione 05 200203 GBR...