background image

[email protected]

5

00_Avvertenze-02 200203

GBR

The  personnel  must use the required D.P.I. in these environments of working.

D.P.I. FOR THE OPERATOR

Pictogram

Description

SHOES

PROTECTION 

GLOVES

SUITABLE 
CLOTHES

GLASSES /

GLASSES FOR 

WELDING

WARNING

•  To do a correct installation of the product, is important to read and follow the instructions below carefully.
•  The company MAC s.r.l  descends any responsibility in the case the manual is not updated.
•  In case of manual or components’ modifi cations, it is at discretion of the customer to ask about them.
•  It is not allowed reproducing partially or publishing this document without the authorization of the company MAC 

S.r.l..

•  Any infraction will be prosecuted in accordance with the procedure prescribed by law.
•  MAC s.r.l.   is exclusive owner of its registered trademark. The brand is affi  xed on labels with CE conformity and 

on seals and danger adhesives. 

•  The removal, cancellation or modifi cation of the label MAC s.r.l.  is strictly forbidden.
•  An improper installation or use of the product may cause damage to people. Everything not expected in these 

instructions is not allowed.

•  The  user  must  abstain  from  any  attempt  to  repair  or  direct  intervention.  Furthermore,  the  user  must  only  call 

qualifi ed and authorized staff .

•  The transit on the bollard must only occur when the device is completely lowered and the traffi  c light is green.
•  Keep  out  of  reach  of  children  remote  controls  or  any  other  device  of  control  in  order  to  avoid  the  accidental 

activation of the automation.

SHIPPING

•  All the products are accurately checked and tested by the manufacturer before the shipping.
•  At  the moment of  delivery,  check  if  the  bollard  has  been damaged  during  the transport. Moreover,  check that 

nothing has been rigged  or  removed.  In  case  of  noticing  damages  or missing  parts,  warn  the courier  and  the 
manufacturer sending them related photo documentation. 

WASTE DISPOSAL

•  MAC s.r.l  recommends to respect the environment by promoting recycling waste.
•  All the components must be disposed following the regulations of the installation’s place.
•  Battery, electric and electronic elements may contain noxious and polluting substances. That components must 

be  removed  and  consigned  to  companies  specialized  in  recycling  noxious  waste  as  indicated  in  the  directive 
2012/19/UE.

TRANSPORT AND LIFTING

•  The transport and lifting of the bollard must occur with specifi c equipment and in compliance with safety regulations 

in force in the area of the product’s installation and by expert staff .

•  Check the effi  ciency and the payload of the transportation before to proceed with the bollard’s movement.
•  To  not  cause  damages  to  people  or  to  materials  it  is  necessary  to  implement  any  possible  precaution.  It  is 

opportune to avoid abrupt movements that may ruin the bollard and cause damages to things or people. 

•  To lift the bollard or its parts, are needed means of transport with a minimum load larger than the declared weight. 

These  means  of  transport  must  have  the  CE  label  with  the  related  certifi cates  in  force,  like  cables  and  lifting 
eyebolts.

•  To have a better load stability, it is necessary to keep the load as low as possible during the movements.  
•  Make sure that there are no people not involved in the work nearby during the installation and its operation. 

Содержание C275A

Страница 1: ...00_FS 00 200220 C275A MANUAL GBR CAREFULLY READ THE MANUAL BEFORE USE Customer Timbre Signature Installing Company Timbre Signature...

Страница 2: ...HE MAINTENANCE 18 BOLLARD S CLIMB STRENGTH REGULATION 19 SENSITIVE HEAD EXTRACTION 20 REGULATION AND ADDITIONAL CENTERING 21 OIL CHANGE 22 SELF REGULATING RESISTANCE 23 ACOUSTIC BUZZER 24 WARRANTY 25...

Страница 3: ...info mac srl it 3 00_FS 00 200220 C275A A B C D 273 500 481 731 273 700 481 931 273 800 481 1031 A B D C GBR DIMENSIONS...

Страница 4: ...II B 2 All II B 3 All II B 4 All II B 6 All II B 7 All II B 8 All II B 5 Morciola di Vallefoglia 07 01 2013 APPROXIMATELY MACHINE DECLARATION OF INCORPORATION IN ACCORDANCE WITH THE EUROPEAN DIRECTIV...

Страница 5: ...s are accurately checked and tested by the manufacturer before the shipping At the moment of delivery check if the bollard has been damaged during the transport Moreover check that nothing has been ri...

Страница 6: ...non compliance of its products and accessories installation methods The maintenance technician must insert the protections against the indirect contacts upstream of the power line following the regul...

Страница 7: ...ally create a sewer system Caution This type of system has been thought for land with poor draining qualities where digging water is immediately found and or where there is not the possibility to carr...

Страница 8: ...diameter This pipe must be connected to the sewer system or in alternative to a well equipped by an emptying system with a greater depth Insert gravel with grain 22 32 mm diameter and 220m height In o...

Страница 9: ...to protrude 20mm from the oor level in order to limit the enter of rainwater in the little well Gradually insert the concrete verifying that the hole is lled uniformly Deal the concrete so as to not t...

Страница 10: ...200220 9 u m m 0 00 0 00 0 02 P 02 0 02 P 02 u m m 0 00 0 00 0 02 GBR N B Make the connection N B Remove the protections of polystyrene from the runner Make sure that the concrete is solidi ed before...

Страница 11: ......

Страница 12: ......

Страница 13: ......

Страница 14: ......

Страница 15: ......

Страница 16: ......

Страница 17: ......

Страница 18: ......

Страница 19: ......

Страница 20: ......

Страница 21: ......

Страница 22: ......

Страница 23: ......

Страница 24: ......

Страница 25: ...ants and the devices must be submitted to a regular technical maintenance The detected defects must be removed as soon as possible because they may compromise the safety and the health Regardless of w...

Страница 26: ...ke Not to weld and move close ames during the replacement operations and the ll of the uid Not to make welding in presence of uids Not to carry out any operation when the product is activated Never to...

Страница 27: ...ll the circuit components are installed and ready for the use Control that the pipes are correctly connected by checking the tightening of the joints so as to avoid damages and uid leaks Before to pro...

Страница 28: ...provided Yes Check the release func onality Yes Check the oil leaks from roller tubes vents control unit release Yes Check with simple tests the correct electrical or mechanic safe es like sensible he...

Страница 29: ...wer consump on An electric absorp on increase at the same payload pressure indicates plant anomalies Yes Check the uid temperature The uid never must exceed 90 C The passing of this value is a cause o...

Страница 30: ...rns or indicators state Magne c coil photocells state Electric valve state where provided Hydraulic system e ciency state control unit unlock piston Hydraulic oil state oil level and quality degraded...

Страница 31: ...______________________________________________________ Model Type Serial Number Safety devices _______________________________________________________________________________ Model Type Serial Number...

Страница 32: ...Lubrication devices 11 Counterweights and suspensions 12 trapezoidal screw for the lifting 13 Unlock Maximum pressure valve 14 LED lighting head ashing light 15 Tra c light and additional signal ligh...

Страница 33: ...oidal screw for the lifting 13 Unlock Maximum pressure valve 14 LED lighting head ashing light 15 Tra c light and additional signal lights 16 Sensitive head additional pressure switches 17 Electric va...

Страница 34: ...y work hours Replace the oil Oil with solid bodies in it Manual unlock is open See point 1 See point 1 electric valves are open Electrical valve broken Replace the electrical valve Mechanic aw Low vol...

Страница 35: ...lock is open See point 1 See point 1 electric valves are open See point 1 Irregular set of the limit switch sensors Wrong reading of the limit switch Set the limit switch in the right posi on check th...

Страница 36: ...ntacts Replace the limit switch Contact oxida on No contact lubrica on Do ordinary maintenance Contact the constructor 15 SENSITIVE HEAD DOESN T INVERT THE MOVEMENT See point 15 See point 15 See point...

Страница 37: ...info mac srl it 37 00_Manutenzione 05 200203 GBR...

Страница 38: ...www mac srl it 38 00_Manutenzione 05 200203 GBR...

Страница 39: ...info mac srl it 39 00_Manutenzione 05 200203 GBR...

Страница 40: ...www mac srl it 40 00_Manutenzione 05 200203 GBR...

Отзывы: