00_Manutenzione-05 200203

GBR

WARNINGS FOR THE HYDRAULIC COMPONENTS MAINTENANCE 

HYDRAULIC CONNECTIONS REALIZED WITH RIGID PIPES
Use cold drawn steel tubes without welds, annealed copper tubes, high pressure hydraulic PVC pipes.
    • For dimensions up to diameter 32 (DN32) use tubes following DIN2391.
    • For dimensions starting from diameter 40 (DIN40) and pressures up to 160 Bar, use tubes following DIN2448.

To calculate the diameter and thickness of the tubes considering the maximum pressure and capacity.
Comply with the values below:
    • Fluid speed in the delivery pipes: 3-6 mt/s
    • Fluid speed in the return pipes: 2-3 mt/s
    • Fluid speed in the suction pipes: 0,5 mt/s

HYDRAULIC CONNECTIONS REALIZED WITH FLEXIBLE PIPES  
Strictly  respect  manufacture  indications  relate  to  the  operating  pressure,  the  compatibility  with  the  fl uid  and  the 
installation and maintenance regulations.
The joints must be chosen according to the operating pressure and the pipes diameter: 
    • For joints up to 1” ½ is recommended to use three cutting ring fi tting, with curb to weld and seal with O-Ring 
DIN2353. 
    • The connections must be realized with fl ange if the joint is more than 1” ½ (SAE 3000 – SAE 6000).

CHECKS FOR THE FIRST START OF THE PRODUCT

•  Control that all the circuit components are installed and ready for the use.
•  Control that the pipes are correctly connected by checking the tightening of the joints so as to avoid damages and 

fl uid leaks.

•  Before to proceed with the tank fi lling, check that it is internally clean. Regarding the cleaning, use vacuum for 

liquids and solids and non-fi lamented mops. Not to use degreaser or solvents for the internal cleaning. 

•  The tank fi lling with the operating fl uid must be carried out only through the specifi c loading cap.
•  Make sure that the fl uid is the same prescribed and listed in the “recommended fl uids” table.
•  Filter the fl uid before to put it in the tank, because even a new fl uid may contain polluting particles.

FIRST START OF THE PRODUCT

•  Open the faucets on the pumps aspiration.
•  Reset the settings of the pressure regulating valves by turning the regulating screws in counter-clockwise.
•  Make sure that the circuit is free of air and the cycle sequences are correct. 
•  Make sure that there aren’t leaks toward outwards and that all the pipes are correctly connected.
•  Carry out the pressure and fl ow calibrations indicated in the diagram by blocking them.
•  Pay specifi c attention to the noise during the functioning. 
•  In the fi rst hours of operation, control the fl uid level in the tank and check if there are leaks. 
•  After the fi rst 100 hours of operation, check the cleaning and the temperatures. 
•  Check the maintenance sheets to decide how often replace the fl uid (table n°2).

Содержание C275A

Страница 1: ...00_FS 00 200220 C275A MANUAL GBR CAREFULLY READ THE MANUAL BEFORE USE Customer Timbre Signature Installing Company Timbre Signature...

Страница 2: ...HE MAINTENANCE 18 BOLLARD S CLIMB STRENGTH REGULATION 19 SENSITIVE HEAD EXTRACTION 20 REGULATION AND ADDITIONAL CENTERING 21 OIL CHANGE 22 SELF REGULATING RESISTANCE 23 ACOUSTIC BUZZER 24 WARRANTY 25...

Страница 3: ...info mac srl it 3 00_FS 00 200220 C275A A B C D 273 500 481 731 273 700 481 931 273 800 481 1031 A B D C GBR DIMENSIONS...

Страница 4: ...II B 2 All II B 3 All II B 4 All II B 6 All II B 7 All II B 8 All II B 5 Morciola di Vallefoglia 07 01 2013 APPROXIMATELY MACHINE DECLARATION OF INCORPORATION IN ACCORDANCE WITH THE EUROPEAN DIRECTIV...

Страница 5: ...s are accurately checked and tested by the manufacturer before the shipping At the moment of delivery check if the bollard has been damaged during the transport Moreover check that nothing has been ri...

Страница 6: ...non compliance of its products and accessories installation methods The maintenance technician must insert the protections against the indirect contacts upstream of the power line following the regul...

Страница 7: ...ally create a sewer system Caution This type of system has been thought for land with poor draining qualities where digging water is immediately found and or where there is not the possibility to carr...

Страница 8: ...diameter This pipe must be connected to the sewer system or in alternative to a well equipped by an emptying system with a greater depth Insert gravel with grain 22 32 mm diameter and 220m height In o...

Страница 9: ...to protrude 20mm from the oor level in order to limit the enter of rainwater in the little well Gradually insert the concrete verifying that the hole is lled uniformly Deal the concrete so as to not t...

Страница 10: ...200220 9 u m m 0 00 0 00 0 02 P 02 0 02 P 02 u m m 0 00 0 00 0 02 GBR N B Make the connection N B Remove the protections of polystyrene from the runner Make sure that the concrete is solidi ed before...

Страница 11: ......

Страница 12: ......

Страница 13: ......

Страница 14: ......

Страница 15: ......

Страница 16: ......

Страница 17: ......

Страница 18: ......

Страница 19: ......

Страница 20: ......

Страница 21: ......

Страница 22: ......

Страница 23: ......

Страница 24: ......

Страница 25: ...ants and the devices must be submitted to a regular technical maintenance The detected defects must be removed as soon as possible because they may compromise the safety and the health Regardless of w...

Страница 26: ...ke Not to weld and move close ames during the replacement operations and the ll of the uid Not to make welding in presence of uids Not to carry out any operation when the product is activated Never to...

Страница 27: ...ll the circuit components are installed and ready for the use Control that the pipes are correctly connected by checking the tightening of the joints so as to avoid damages and uid leaks Before to pro...

Страница 28: ...provided Yes Check the release func onality Yes Check the oil leaks from roller tubes vents control unit release Yes Check with simple tests the correct electrical or mechanic safe es like sensible he...

Страница 29: ...wer consump on An electric absorp on increase at the same payload pressure indicates plant anomalies Yes Check the uid temperature The uid never must exceed 90 C The passing of this value is a cause o...

Страница 30: ...rns or indicators state Magne c coil photocells state Electric valve state where provided Hydraulic system e ciency state control unit unlock piston Hydraulic oil state oil level and quality degraded...

Страница 31: ...______________________________________________________ Model Type Serial Number Safety devices _______________________________________________________________________________ Model Type Serial Number...

Страница 32: ...Lubrication devices 11 Counterweights and suspensions 12 trapezoidal screw for the lifting 13 Unlock Maximum pressure valve 14 LED lighting head ashing light 15 Tra c light and additional signal ligh...

Страница 33: ...oidal screw for the lifting 13 Unlock Maximum pressure valve 14 LED lighting head ashing light 15 Tra c light and additional signal lights 16 Sensitive head additional pressure switches 17 Electric va...

Страница 34: ...y work hours Replace the oil Oil with solid bodies in it Manual unlock is open See point 1 See point 1 electric valves are open Electrical valve broken Replace the electrical valve Mechanic aw Low vol...

Страница 35: ...lock is open See point 1 See point 1 electric valves are open See point 1 Irregular set of the limit switch sensors Wrong reading of the limit switch Set the limit switch in the right posi on check th...

Страница 36: ...ntacts Replace the limit switch Contact oxida on No contact lubrica on Do ordinary maintenance Contact the constructor 15 SENSITIVE HEAD DOESN T INVERT THE MOVEMENT See point 15 See point 15 See point...

Страница 37: ...info mac srl it 37 00_Manutenzione 05 200203 GBR...

Страница 38: ...www mac srl it 38 00_Manutenzione 05 200203 GBR...

Страница 39: ...info mac srl it 39 00_Manutenzione 05 200203 GBR...

Страница 40: ...www mac srl it 40 00_Manutenzione 05 200203 GBR...

Отзывы: