www.mac-srl.it
28
00_Manutenzione-05 200203
GBR
ORDINARY AND EXTRAORDINARY PLANNED PROCEDURE
Check that:
• The operation area where to do the maintenance is well delimited by specifi c signage;
• In the maintenance delimited area, the access is forbidden to unauthorized people and animals;
• The maintainer is provided with D.P.I. devices;
• The product power source is interrupted.
The technician must always pay full attention to the cables placed upstream of the general switch because they
remain turned on.
TABLE N°1 GENERAL ORDINARY MAINTENANCE CONTROLS
Period
Descrip on of opera ons for general controls
6
months
12
months
Yes
Check the bollard does all the commands (both mechanics and radio controlled)
Yes
Check the hold-to-run control don’t put people in danger
Yes
Check the electronic devices state and their working logics
Yes
Check the surface paint state and eventually, clean or retouch it
Yes
Check the bollard handling linearity
Yes
Check the bollard doesn’t make abnormal sounds
Yes
Check the acous c buzzer func onality (for blind persons) (where provided)
Yes
Check the func onality of the emergency vehicles sound recognizer European approved sirens (where provided)
Yes
Check the traffi c light and fl ashing smart LED func onality
Yes
Check the magne c coil/photoelectric cells
Yes
Check the electrical valve func onality (where provided)
Yes
Check the release func onality
Yes
Check the oil leaks (from roller, tubes, vents, control unit, release)
Yes
Check with simple tests the correct electrical or mechanic safe es (like sensible head) func onality (with specifi c tools)
Yes
Check the bolts and screws ghtening for the fi xing of components
Yes
Check the power electric line
Yes
Check the grounding system
Yes
Check the ground conductors, sewer, PE, main and secondary equipoten al conductors
Yes
Check the polyurethane mould or polythene (in plas c) band en rety on the tube/pla orm
Yes
Check the mechanic/magne c limit switch func onality
Yes
Check the non-condensa on resistance func onality
Yes
Check the an -wear polythene guidelines (green/black colour)
Yes
Regula on limit stop piston
Yes
Regula on pressure switch (where provided)
Yes
Keep clean the water sewer drainage placed on the bo om of the formwork
Yes
Check the presence of water into the formwork (to prevent malfunc ons, ask the constructor if the water level rest constantly
high)
Yes
Check the presence of condensa on into the sensi ve head (ask the constructor in case of big quan ta ve of water)
Yes
Check the presence of Vaseline on the mechanic contacts of the sensi ve head
Yes
Remove any materials or salt accumula ons se led into the formwork
Yes
Oil swap every 1.000.000 opera ons or a er a year (only with compa ble oil)
Yes
Check the oil level or the presence of water inside it
Yes
Check the oil drawing state from the head of the cylinder
Yes
Regula on of the maximum pressure valve of the pump
Содержание C275A
Страница 11: ......
Страница 12: ......
Страница 13: ......
Страница 14: ......
Страница 15: ......
Страница 16: ......
Страница 17: ......
Страница 18: ......
Страница 19: ......
Страница 20: ......
Страница 21: ......
Страница 22: ......
Страница 23: ......
Страница 24: ......
Страница 37: ...info mac srl it 37 00_Manutenzione 05 200203 GBR...
Страница 38: ...www mac srl it 38 00_Manutenzione 05 200203 GBR...
Страница 39: ...info mac srl it 39 00_Manutenzione 05 200203 GBR...
Страница 40: ...www mac srl it 40 00_Manutenzione 05 200203 GBR...