background image

[email protected]

25

00_Manutenzione-05 200203

GBR

WARRANTY

•  The products of Mac s.r.l.  have 24 (twenty-four) months of warranty from the billing date against manufacturing 

and/or components defects.

•  The  warranty  can  be  extended  only  if  the  customer  subscribes  the  required  biannual  checks  imposed  by  the 

legislative regulations.

•  The warranty expires:

•  From the moment in which the customer doesn’t respect the ordinary maintenance contract imposed by the 

legislative regulations in force, by CEE 2006/42/CE and by the manufacturer’s indications;

•  In case of the customer and/or the product manager doesn’t subscribe a planned biannual maintenance (every 

6 months) with a specialized company for the fi rst 24 months starting from the billing date;

•  In case of tampering or fi xing carried out by unauthorized personnel;
•  In case of non-original spare parts are used;  
•  In case of improper use of the product;
•  In case of sudden occurrence of natural events;
•  In case of the customer refuses to return the defective product or component to repair service so as to verify 

possible defects;  

•  In case of removing the product identifi cation labels. Request their replacement if they are deteriorated.

•  Complaints or controversies must be documented by multimedia contents and sent to the manufacturer or to local 

repair service within 8 (eight) days from the date of receipt of the product or component. These complaints or 
controversies don’t give the right to interrupt the payments. Any return must be previously agreed and authorized 
by the manufacturer and carried out in free port.

MAINTENANCE OBLIGATIONS 

•  The  machinery  directive  2006/42/CE  and  successive  force  to  a  “correct  installation  and  maintenance”  of  the 

device.

•  The single text  81/2008 art.  64  com.1.c force that  “the plants and  the  devices  must be submitted to a regular 

technical maintenance. The detected defects must be removed as soon as possible because they may compromise 
the safety and the health.

•  Regardless of whether the product is installed in a public or private area, that place will be considered “work area” 

and that involves the respect and the obligation of the reference regulations.

•  For  a  correct  and  long-lasting  use  of  the  product,  MAC  s.r.l.   recommends  to  subscribes  a  planned  biennial 

maintenance (every 6 months) with a specialized installer company. After every intervention of maintenance that 
company must release to the customer a documentation with the test results performed. 

•  In case of the customer decides to not activate the product for a long period, it is advisable to make it inoperative 

by interrupting power source. 

•  In case of the product is activated after a long period of inactivity, it is advisable to contact a specialized company 

for a prior check of all components. That company must also certify the correct operation of the product. 

GENERAL WARNINGS

•  This manual contains the necessary information for a correct mechanic, hydraulic and electrical maintenance.
•  Important, in order to avoid malfunctions that may cause directly or indirectly grave accidents and/or damages to 

people or objects, it is advisable to observe and respect the instructions and the indications of this manual. 

•  The maintenance must be only carried out by specialized companies’ experts in the fi eld. 
•  The maintainer must be fully formed and informed about all the characteristics and requirements of the product.
•   The maintainer must respect all the safety regulations in force in the area of intervention. 
•  The information described in this manual are necessary for a correct ordinary and extraordinary maintenance of 

the product.

•  In case of unusual problems or it is necessary to have further explanation during the maintenance, please contact 

MAC s.r.l. company. 

Содержание C275A

Страница 1: ...00_FS 00 200220 C275A MANUAL GBR CAREFULLY READ THE MANUAL BEFORE USE Customer Timbre Signature Installing Company Timbre Signature...

Страница 2: ...HE MAINTENANCE 18 BOLLARD S CLIMB STRENGTH REGULATION 19 SENSITIVE HEAD EXTRACTION 20 REGULATION AND ADDITIONAL CENTERING 21 OIL CHANGE 22 SELF REGULATING RESISTANCE 23 ACOUSTIC BUZZER 24 WARRANTY 25...

Страница 3: ...info mac srl it 3 00_FS 00 200220 C275A A B C D 273 500 481 731 273 700 481 931 273 800 481 1031 A B D C GBR DIMENSIONS...

Страница 4: ...II B 2 All II B 3 All II B 4 All II B 6 All II B 7 All II B 8 All II B 5 Morciola di Vallefoglia 07 01 2013 APPROXIMATELY MACHINE DECLARATION OF INCORPORATION IN ACCORDANCE WITH THE EUROPEAN DIRECTIV...

Страница 5: ...s are accurately checked and tested by the manufacturer before the shipping At the moment of delivery check if the bollard has been damaged during the transport Moreover check that nothing has been ri...

Страница 6: ...non compliance of its products and accessories installation methods The maintenance technician must insert the protections against the indirect contacts upstream of the power line following the regul...

Страница 7: ...ally create a sewer system Caution This type of system has been thought for land with poor draining qualities where digging water is immediately found and or where there is not the possibility to carr...

Страница 8: ...diameter This pipe must be connected to the sewer system or in alternative to a well equipped by an emptying system with a greater depth Insert gravel with grain 22 32 mm diameter and 220m height In o...

Страница 9: ...to protrude 20mm from the oor level in order to limit the enter of rainwater in the little well Gradually insert the concrete verifying that the hole is lled uniformly Deal the concrete so as to not t...

Страница 10: ...200220 9 u m m 0 00 0 00 0 02 P 02 0 02 P 02 u m m 0 00 0 00 0 02 GBR N B Make the connection N B Remove the protections of polystyrene from the runner Make sure that the concrete is solidi ed before...

Страница 11: ......

Страница 12: ......

Страница 13: ......

Страница 14: ......

Страница 15: ......

Страница 16: ......

Страница 17: ......

Страница 18: ......

Страница 19: ......

Страница 20: ......

Страница 21: ......

Страница 22: ......

Страница 23: ......

Страница 24: ......

Страница 25: ...ants and the devices must be submitted to a regular technical maintenance The detected defects must be removed as soon as possible because they may compromise the safety and the health Regardless of w...

Страница 26: ...ke Not to weld and move close ames during the replacement operations and the ll of the uid Not to make welding in presence of uids Not to carry out any operation when the product is activated Never to...

Страница 27: ...ll the circuit components are installed and ready for the use Control that the pipes are correctly connected by checking the tightening of the joints so as to avoid damages and uid leaks Before to pro...

Страница 28: ...provided Yes Check the release func onality Yes Check the oil leaks from roller tubes vents control unit release Yes Check with simple tests the correct electrical or mechanic safe es like sensible he...

Страница 29: ...wer consump on An electric absorp on increase at the same payload pressure indicates plant anomalies Yes Check the uid temperature The uid never must exceed 90 C The passing of this value is a cause o...

Страница 30: ...rns or indicators state Magne c coil photocells state Electric valve state where provided Hydraulic system e ciency state control unit unlock piston Hydraulic oil state oil level and quality degraded...

Страница 31: ...______________________________________________________ Model Type Serial Number Safety devices _______________________________________________________________________________ Model Type Serial Number...

Страница 32: ...Lubrication devices 11 Counterweights and suspensions 12 trapezoidal screw for the lifting 13 Unlock Maximum pressure valve 14 LED lighting head ashing light 15 Tra c light and additional signal ligh...

Страница 33: ...oidal screw for the lifting 13 Unlock Maximum pressure valve 14 LED lighting head ashing light 15 Tra c light and additional signal lights 16 Sensitive head additional pressure switches 17 Electric va...

Страница 34: ...y work hours Replace the oil Oil with solid bodies in it Manual unlock is open See point 1 See point 1 electric valves are open Electrical valve broken Replace the electrical valve Mechanic aw Low vol...

Страница 35: ...lock is open See point 1 See point 1 electric valves are open See point 1 Irregular set of the limit switch sensors Wrong reading of the limit switch Set the limit switch in the right posi on check th...

Страница 36: ...ntacts Replace the limit switch Contact oxida on No contact lubrica on Do ordinary maintenance Contact the constructor 15 SENSITIVE HEAD DOESN T INVERT THE MOVEMENT See point 15 See point 15 See point...

Страница 37: ...info mac srl it 37 00_Manutenzione 05 200203 GBR...

Страница 38: ...www mac srl it 38 00_Manutenzione 05 200203 GBR...

Страница 39: ...info mac srl it 39 00_Manutenzione 05 200203 GBR...

Страница 40: ...www mac srl it 40 00_Manutenzione 05 200203 GBR...

Отзывы: