![Maber MB500/120-SP Скачать руководство пользователя страница 43](http://html.mh-extra.com/html/maber/mb500-120-sp/mb500-120-sp_instruction-and-maintenance-manual_685038043.webp)
43
3- BUILDING MEASURES
1- Building measures of the blocking gate mechanism
2- Building measures of the unblocking lever
The unblocking lever is assembled on the outer side of the chassis of the front closing.
The assembly is made by using the blocking plate fixed through suitable screws.
Use the lever putting the shaped cam inside the box. Hold the unblocking lever with its
handle. Keep the unblocking lever connected with the chain to the transport drum is
always compulsory. It does not allow the drum to rotate when the unblocking lever is
inserted and the gate is open.
COPY
Содержание MB500/120-SP
Страница 32: ...32 28 ELECTRICAL DIAGRAM MB 500 120 SP RACK AND PINION HOIST ONE PHASE C O P Y ...
Страница 36: ...36 C O P Y ...
Страница 48: ...48 DISEGNI TECNICI TECHNICAL DRAWINGS DESSINS TECHNIQUES TECHNISCHE ZEICHNUNGEN C O P Y ...
Страница 49: ...49 C O P Y ...
Страница 50: ...50 C O P Y ...
Страница 51: ...51 C O P Y ...
Страница 52: ...52 C O P Y ...