![Maber MB500/120-SP Скачать руководство пользователя страница 42](http://html.mh-extra.com/html/maber/mb500-120-sp/mb500-120-sp_instruction-and-maintenance-manual_685038042.webp)
42
-
Lower the gate properly in horizontal position.
-
Check if the gate block respect the following features:
i
The central line of the upper slit is lined up to the ‘U’ blocking hook fixed on
the gate.
i
The measures specified must be followed.
-
Correct any possible mistakes through proper regulations only at the safety gate.
-
Press lightly the safety gate in order to unblock the rotation of the transport drum.
-
Rotate the transport drum and go on with assembling or working operations.
-
Close the space (see dimension ‘x’ that changes depending on the width of the
scaffolding) between the vertical tube, where the box of the gate is fixed, and the
standard of the scaffolding with protections according to law, in order to avoid any
dangerous situation.
In case the hoist is near a wall, and
the landing is a door on the wall,
follow these instructions to assemble
the safety landing gate:
- Follow the operations used for its
erection described before and follow
the same warnings.
- In order to fix the safety landing gate
assemble a structure made of two
lateral tubes of 48 mm
I
fixed to the
wall through nogs able to support
the transmitted loads. The tube size
is specified in the picture here.
- Assemble the safety landing gate to
the lateral left tube just fixed on the
wall. Remember to assemble the
blocking gate box on the other tube
and check the correct position.
-
Respect the hoist position as
specified in the picture.
COPY
Содержание MB500/120-SP
Страница 32: ...32 28 ELECTRICAL DIAGRAM MB 500 120 SP RACK AND PINION HOIST ONE PHASE C O P Y ...
Страница 36: ...36 C O P Y ...
Страница 48: ...48 DISEGNI TECNICI TECHNICAL DRAWINGS DESSINS TECHNIQUES TECHNISCHE ZEICHNUNGEN C O P Y ...
Страница 49: ...49 C O P Y ...
Страница 50: ...50 C O P Y ...
Страница 51: ...51 C O P Y ...
Страница 52: ...52 C O P Y ...