![Maber MB500/120-SP Скачать руководство пользователя страница 39](http://html.mh-extra.com/html/maber/mb500-120-sp/mb500-120-sp_instruction-and-maintenance-manual_685038039.webp)
39
Code C1200327
1-DESCRIPTION OF THE GATE
The gate is mainly composed of:
- n. 2 battens (upper and intermediate) made of tubular structures;
- stop band at the base;
- lateral closing hook of the gate and mechanical blocking system fixed to the gate
structure. It has an appropriate mechanism that does not allow any manumission;
- lateral clamps for tightening the gate structure;
- bayonet opening of the gate which rotates around a point fixed on the lateral left standard
of the gate.
2-ERECTION AND INSTRUCTIONS
The erection and the instructions for the gate block go for the safety landing gate with a
width of 1300mm.
In order to assemble the gate in a correct way, please follow these instructions:
-
Erect all the masts useful to reach the final height for the gate employment.
-
Tie all the masts.
-
Assemble the stop landing slide (adjusting its cam) as the working floor of the
transport drum exceeds of about 100mm the top of the landing floor (this operation
is necessary for the use of the machine, when loaded, since this difference in level
will be cancelled).
-
Position the landing floor (use tubes and joints) on the scaffolding or the wall. Make
a structure to fix the safety landing gate that should support the load transported by
the machine.
Study the following picture to know the size of the gate:
COPY
Содержание MB500/120-SP
Страница 32: ...32 28 ELECTRICAL DIAGRAM MB 500 120 SP RACK AND PINION HOIST ONE PHASE C O P Y ...
Страница 36: ...36 C O P Y ...
Страница 48: ...48 DISEGNI TECNICI TECHNICAL DRAWINGS DESSINS TECHNIQUES TECHNISCHE ZEICHNUNGEN C O P Y ...
Страница 49: ...49 C O P Y ...
Страница 50: ...50 C O P Y ...
Страница 51: ...51 C O P Y ...
Страница 52: ...52 C O P Y ...