Section 1: Notes for the Reader
P a g e |
2
The operator of the
Easyzon D
system may not make
any changes, attach fittings or make alterations to
the construction of the
system that may impair security,
without the written consent of
Lutz Jesco GB
Ltd. This
also applies to the installation and setup of safety
devices.
Any replacement parts to be used have to correspond to
the technical requirements specified by
Lutz Jesco GB
Ltd. This is always guaranteed in the case of original
spare parts. Only appoint trained or instructed
personnel. Clearly specify the responsibilities of the
personnel for operating, servicing and repairing the
system.
1.8 Instruction & Training Course
Assistance
As a contractor/operator you are obligated to inform
and/or instruct the operating personnel about existing
provisions of law and accident prevention regulations, as
well as existing safety regulations at the plant. In doing
so, the different technical qualifications must be
considered. The operating personnel must have
understood the training and it must be ensured that the
training is adhered to.
Only in this way can you ensure that your personnel work
in a safety conscious and risk aware manner. This should
be
controlled
on
a
regular
basis.
As
the
contractor/operator
you
should
therefore
obtain
confirmation of each of the employee’s attendance in
writing.
On the following pages, you will find examples of the
training course topics, as well as a main form to copy for
the confirmation of attendance.
If the operating personnel still require further training after
the system has been delivered to the operator,
please contact
Lutz Jesco GB
Ltd.
1.9 Example of Training Course Topics
For safety:
•
COSHH
•
Accident prevention regulations
•
General safety precautions
•
Action to be taken in an emergency
•
Safety precautions for operating
•
Safety devices
•
Definition of symbols and signs
For device operation:
•
How to operate the controls
•
Elimination of operational disturbances
•
Interpretation of fault indications
For maintenance and service instructions:
•
Inspection/testing of the system
•
Cleaning the system and exchange of
replacement parts
Содержание Easyzon D 100
Страница 2: ...This page is left intentionally blank...
Страница 10: ...Section 3 Technical Data P a g e 7 3 2 Dimensions 3 2 1 Easyzon D Skid dimensions...
Страница 17: ...Section 6 Installation P a g e 1 4...
Страница 21: ...Section 6 Installation P a g e 18 6 5 2 Field Wiring Diagram Easyzon D PCB Iss 4 electrical diagram...
Страница 45: ......