Section 8: Control
P a g e |
3 0
8.6 Factory Settings
The
Easyzon D
is delivered pre-programmed with the settings shown in the table below. Some settings are adjusted/
enabled on site depending upon the install and application. For help with software navigation see section 8.1 and 8.3.
*It is imperative that this setting is left at 0 minutes for the correct and safe operation of the
Easyzon D
system.
Program
Number
Display Title
Unit
Easyzon D
-
Model
100g/h
200g/h
250g/h
500g/h
1
Exit Menu
2
Prime System
Cycles
40
80
40
80
3
Alarm Delay
(Secs)
60
60
60
60
4
Restart Delay
(Mins)
45
45
45
45
5
Batch Delay
(Mins)
0*
0*
0*
0*
6
Set Clock
-
-
-
-
-
7
Dosing Balance
Pulses
0
0
0
0
8
Show Counters
-
No
No
No
No
9
Engineers Menu
-
****
****
****
****
10
Chlorite Empty
-
No
No
No
No
11
Acid Empty
-
No
No
No
No
12
Bund Switch
-
No
No
No
No
13
Aux Alarm
-
No
No
No
No
14
Remote Inhibit
-
No
No
No
No
15
Site Flowmeter
-
No
No
No
No
16
Site Flow/Pulse
L/Pulse
10
10
10
10
17
Batch Tank Low
-
No
No
No
No
18
TMPR Sensor
-
Yes
Yes
Yes
Yes
19
TMPR High Point
⁰
C
45
45
45
45
20
Modem/Modbus
-
Modbus
Modbus
Modbus
Modbus
21
Modbus Address
-
201
201
201
201
Содержание Easyzon D 100
Страница 2: ...This page is left intentionally blank...
Страница 10: ...Section 3 Technical Data P a g e 7 3 2 Dimensions 3 2 1 Easyzon D Skid dimensions...
Страница 17: ...Section 6 Installation P a g e 1 4...
Страница 21: ...Section 6 Installation P a g e 18 6 5 2 Field Wiring Diagram Easyzon D PCB Iss 4 electrical diagram...
Страница 45: ......