Table of Contents
3
© Lutz-Jesco GmbH 2020
Subject to technical changes.
200922
BA-62010-01-V01
Chlorine Dioxide System
EASYZON Dd
Operating Instructions
Table of Contents
1 Notes for the Reader ..........................................................
4
1.1 General non-discrimination ......................................................
4
1.2 Explanation of the signal words ................................................
4
1.3 Explanation of the warning signs ..............................................
4
1.4 Identification of warnings .........................................................
4
1.5 Identification of action instructions ...........................................
4
2 Safety .................................................................................
5
2.1 General warnings .....................................................................
5
2.2 Hazards due to non-compliance with the safety instructions .....
7
2.3 Working in a safety-conscious manner .....................................
7
2.4 Personal protective equipment .................................................
7
2.5 Personnel qualification .............................................................
7
3 Intended use ......................................................................
9
3.1 Notes on product warranty .......................................................
9
3.2 Intended purpose .....................................................................
9
3.3 Principles ................................................................................
9
4 Product description .........................................................
10
4.1 Scope of delivery ...................................................................
10
4.2 Chlorine dioxide (ClO
2
) in water treatment ...............................
10
4.3 Rating plate ...........................................................................
12
5 Technical data ..................................................................
13
5.1 Information notes for safety ....................................................
13
5.2 Dioxide production room and production reagents storage
room .......................................................................................
14
6 Dimensions ......................................................................
15
7 Installation .......................................................................
17
7.1 General Notes ........................................................................
17
7.2 Installation location ................................................................
17
7.3 Mechanical installation ..........................................................
17
7.4 Pre-dilution circuit .................................................................
17
7.5 Additional connections ...........................................................
17
7.6 Hydraulic installation..............................................................
18
7.7 Electrical installation ..............................................................
19
7.8 Power cables .........................................................................
20
7.9 Grounding ..............................................................................
21
7.10 Safety instructions ...............................................................
21
7.11 Protection fuse of the electronic control unit .........................
21
8 General information .........................................................
22
8.1 Description of the keys ...........................................................
22
8.2 Description of the signals .......................................................
22
8.3 Users .....................................................................................
22
9 Configuration menu .........................................................
23
9.1 Change ..................................................................................
23
9.2 Bleed .....................................................................................
23
9.3 Calibration .............................................................................
23
9.4 Menu .....................................................................................
24
9.5 Saving and dowloading data ..................................................
28
9.6 Information ............................................................................
28
9.7 Equipment data .....................................................................
28
9.8 Main values ...........................................................................
28
9.9 History ...................................................................................
28
10 Commissioning ................................................................
29
10.1 Controls and preliminary arrangements ................................
29
10.2 Pumps bleed ........................................................................
29
10.3 Control of the safety systems ...............................................
29
10.4 Check of the pumps flow rate and setting of configuration
parameters ..................................................................................
29
10.5 Start-up ...............................................................................
29
11 Production safety and malfunctions ...............................
30
11.1 Inductive flow sensors .........................................................
30
11.2 Empty reagents tanks ..........................................................
30
11.3 Analogic input anomaly ........................................................
30
11.4 Gas detector pre-alarm ........................................................
30
11.5 Threshold exceeded ClO
2
gas detector ..................................
31
11.6 Pre-diluition flow lack ..........................................................
31
12 Maintenance ....................................................................
32
13 Disassembling .................................................................
32
14 Warranty claim .................................................................
33
15 Declaration of no objection ..............................................
34
16 EU Declaration of Conformity ...........................................
35
17 Index .................................................................................
36