background image

®

Wallbox Power Module Installation and Operation Guide   6

Completing Installation of the Wallbox Power Module with DALI Control Unit:

 

Step 1:

 Grasp the top corners of the 

wallplate and pull forward to detach it 

from the wallbox power module.

 

Step 2: 

Use the screws provided to 

mount to the wallbox.

 

Note:

 When mounted in the wallbox, the 

QS Link cable and terminal block should 

remain separated from the line voltage/

mains cables.

Step 3: 

To snap the wallplate on, rest 

the top of the wallplate in the grooves at 

the top of the unit and press firmly at the 

bottom corners to secure.

Step 4: 

Turn on circuit breaker and check 

that it does not trip. For any feed circuit 

that trips, locate the short or resolve the 

wiring problem before proceeding.

  Step 5: Use Default Scene Button:

  To test the lights or control the lights 

when the WPM is not connected or 

communicating with the system, use the 

default scene button. The LED will toggle 

on/off following the local press on/off of 

the default scene button.

Wallbox

Wallbox Power 

Module

Wallplate

Mounting Screws

LUTRON

Status LED

Default Scene Button

ON

OFF

ON

OFF

ON

OFF

Содержание LQR-WPM-16D

Страница 1: ...mbers Ratings 120 240 V 50 60 Hz 100 mA 230 V 50 60 Hz 100 mA Typical Power Consumption 7 W 24 BTUs Power Draw Units PDUs 0 Output DALI Link 18 V 250 mA Codes Install in accordance with all applicable...

Страница 2: ...age terminal can accept one 4 0 mm2 wire Consult Lutron for non dim relay wiring and or load side emergency transfer wiring D1 D1 D2 D2 1 2 3 4 5 6 L N 1 2 3 4 5 6 L N Wiring the Wallbox Power Module...

Страница 3: ...WARNING Shock hazard May result in serious injury or death Always turn off circuit breaker or remove main fuse from power line before doing any work Step 3 Connect line voltage and loads to control u...

Страница 4: ...e live Always turn off circuit breaker or remove main fuse from power line before wiring and servicing the Wallbox Power Module Step 1 Use the wire size chart at right to determine which wire size to...

Страница 5: ...use from power line before doing any work Step 1 Strip 25 mm of insulation from the IEC PELV NECR Class 2 cable Step 2 Strip 7 mm of insulation from each wire in the cable Step 3 Connect the wires to...

Страница 6: ...e on rest the top of the wallplate in the grooves at the top of the unit and press firmly at the bottom corners to secure Step 4 Turn on circuit breaker and check that it does not trip For any feed ci...

Страница 7: ...ou to move through the menu choices The current choice is highlighted on the info screen OK Button The OK button chooses the current highlighted menu choice This will either take you to the next menu...

Страница 8: ...tton to erase all current programming reset and address DALI devices and find sensors on the system 5 Exit programming mode Note After running Build System Zone 4 will control all DALI devices for dia...

Страница 9: ...display at the bottom of the screen and the LEDs for the zone will go on otherwise the info screen will display Unassigned Press the zone raise button to assign the device to that zone Press the zone...

Страница 10: ...he OK button to accept 3 Use the Master buttons to highlight Address All and press the OK button to accept All DALI devices in the system will go to full On As each DALI device is addressed the Wallbo...

Страница 11: ...the third tap Step 2 Keep the Default Scene Button pressed on the third tap for approximately 3 seconds until the LED flashes slowly Step 3 Release the Default Scene Button and immediately triple tap...

Страница 12: ...and shorts HomeWorksR QS only Device is in the Factory Default Settings mode and has not been activated into the system Use the system software to verify activation or reactivate the device and transf...

Отзывы: