
Chapter 3 Installation and Trial-Run
3-3
3.3 The Order for Setting up Products till Running
The following describes the order of installing or setting up products. Install the system and setting up the parameter so that
they can operate in order.
Start
● Check out the sizes and standards to be used
● Install the module to the base
● Check out the location of the base and the slot
● Check out the LED state of a communication module after power is authorized. (RUN:
Green)
● Connect to CPU using XG5000
● Carry out “I/O Sync” in XG5000
● The module appears in project window after executing “I/O Sync”
● Set up the basic parameter
▶
IP Address, Subnet Mask, Gateway
● Install the necessary EDS file
● Set up EIP parameter
▶
Channels, Functions, Starting Conditions, Data Sizes and Areas, Types
● Execute “Write Parameter” and “Enable Link”
● Execute EIP communication
Содержание XBL-EIPT
Страница 53: ...Chapter 5 Installation of Software and communication Parameters 5 18 ...
Страница 98: ...Chapter 7 Diagnosis Function 7 11 Figure 7 3 4 FlashArea Log Screen of System Log ...
Страница 106: ...Chapter 7 Diagnosis Function 7 19 Fig 7 4 9 Remote 2 connection directly via Ethernet ...
Страница 119: ...Appendix A 12 A 3 External Dimension Dimension Unit mm XBL EIPT ...